Typical survey accuracy and <strong>installation</strong> ToleranceItemDriven Piles forFlowlineinitiation andrestraintDriven Piles forManifoldfoundationPositioningMethodAccuracy <strong>of</strong>LBL ArrayAbsoluteInstallationToleranceAccuracyOf SubseaGyroHeadingToleranceAccuracy <strong>of</strong>InclinometerInclinationMF LBL +/- 0.25m +/- 2m +/- 0.5° +/- 7.5° +/- 0.05° +/- 3° from trueverticalMF LBL +/- 0.25m +/- 2m +/- 0.5° +/- 7.5° +/- 0.05° +/- 3° from trueverticalPLET MF LBL +/- 0.25m +/- 1.5m +/- 0.5° +/- 2° +/- 0.05° +/- 2° from trueverticalDMA MF LBL +/- 0.25m +/- 2m n/a n/a n/a n/aFlowline lay MF LBL +/- 0.25m +/-2.5mcorridorn/a n/a n/a n/a