12.07.2015 Views

MSE Construction Methods in Part-Width Construction

MSE Construction Methods in Part-Width Construction

MSE Construction Methods in Part-Width Construction

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contractor Reason<strong>in</strong>g for Choos<strong>in</strong>g <strong>MSE</strong>• <strong>MSE</strong> configured bridge saved +/- 2% on bridge cost• <strong>MSE</strong> wall does not require deep excavation• Quick construction – once excavated, backfill<strong>in</strong>g <strong>in</strong> shorttime• Crew utilization – doubl<strong>in</strong>g up of work activities

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!