12.07.2015 Views

profile on production of workers overall and gowns - SNNPR ...

profile on production of workers overall and gowns - SNNPR ...

profile on production of workers overall and gowns - SNNPR ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

248-15B. PRODUCTION COSTThe annual producti<strong>on</strong> cost at full operati<strong>on</strong> capacity is estimated at Birr 1.07 milli<strong>on</strong>(see Table 7.2). The material <strong>and</strong> utility cost accounts for 28.19 per cent, while repair<strong>and</strong> maintenance take 6.98 per cent <strong>of</strong> the producti<strong>on</strong> cost.Table 7.2ANNUAL PRODUCTION COST AT FULL CAPACITY ('000 BIRR)Items Cost %Raw Material <strong>and</strong> Inputs238.30 22.18Utilities64.57 6.01Maintenance <strong>and</strong> repair75 6.98Labour direct140.35 13.06Factory overheads58.48 5.44Administrati<strong>on</strong> Costs93.57 8.71Total Operating Costs670.27 62.38Depreciati<strong>on</strong>215.93 20.10Cost <strong>of</strong> Finance188.22 17.52Total Producti<strong>on</strong> Cost1,074.42 100C. FINANCIAL EVALUATION1. Pr<strong>of</strong>itabilityAccording to the projected income statement, the project will start generating pr<strong>of</strong>it in thefirst year <strong>of</strong> operati<strong>on</strong>. Important ratios such as pr<strong>of</strong>it to total sales, net pr<strong>of</strong>it to equity(Return <strong>on</strong> equity) <strong>and</strong> net pr<strong>of</strong>it plus interest <strong>on</strong> total investment (return <strong>on</strong> totalinvestment) show an increasing trend during the life-time <strong>of</strong> the project.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!