12.07.2015 Views

PROFILE ON PRODUCTION OF FISHING NET AND SPORTS NET

PROFILE ON PRODUCTION OF FISHING NET AND SPORTS NET

PROFILE ON PRODUCTION OF FISHING NET AND SPORTS NET

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

84-112. Land, Building and Civil WorksThe processing building requires a steel structure covered with EGA sheet roof, HCBwall, and cement screed floor finish. The total area of land required is estimated to be2,500 m 2 , out of which 800 m 2 will be built-up area. The cost of land at the rate of Birr0.625 per square meter and for 80 years of land lease will amount to Birr 125,000.00 Thetotal cost of building and civil works at the unit cost of Birr 2,300 per m 2 is estimated atBirr 1,840,000.003. Proposed LocationThe plant should be located where the raw material, infrastructure, power and utility areavailable. Hence, the plant is proposed to be located in Arba Minch/ Dilla/Welaita sodoor Hosana.VI.MANPOWER <strong>AND</strong> TRAINING REQUIREMENTA. MANPOWER REQUIREMENTThe total manpower requirement of the plant is 22 persons. Details of manpower andestimated annual labor cost including fringe benefits are indicated in Table 6.1.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!