KIOCL LIMITEDPANAMBUR, MANGALORE - 575 O10COMPLIANCE REPORT: Instattation of Btast Furnace (350 m3) to produce 0.15 MTA pig tronand 0.05 MTA Ductile lron Spun Pipe along with 7 MW Cpp basedon Blast Furnace Gas - Environmental clearance regarding(No. J- 11012/26/95-tA-11(t)dated 13.12.1995)st.Consent ConditionsNo.2(t The project authorities must(tri.tlu 2.lhora i^ lhastipulations made by the State Pollut on Control Board/Government.ComplianceComplied with.2 \t)No expansion or modification of the plant should be carried Complied wlth.out without prior approval of this l\.4 in stry Coke Oven Plantwill not be set up and the required coke will be imported.2 (iti)The gaseous emissions (SPlV, SO2, NOX & CO) from the Complied with.vanouS process Units should conform to the standardsprescribed by the concerned authorities, from time to time.At no time, the emiss ons should go beyond the prescribedstandards. In the event of failure of any poilution controsystem adopted by the unit, the respective unit should beput out of operation immediately and should not be restarteduntrl the control measures are rectified to achieve thedesired efficiency.2 Al reast 'ourliv) a'rlorenl ai. q-at ty .norutoring stat,onsh Complied with.be set up in the down wind direction as well as wheremaximum ground level concentrations of SPM, S02 andNOX are anticipated in consultation with the State PollutionControl Board. Sampl ng port holes for collection of samples From August 2009 onwardsshould be prov ded in the stacks as per the Central Pollutton the Blast furnace s notControl Board gu idel nes.unoer operaton.Data on ambient air quality and stack emissionshould besubrnitted to this Ministry once in six months and the StatePollution Control Board once n three months along with thestatistical ana vsrs and interDretation.2 (v)In-plant contro measures including better work practicesshou d be adopted for mproving work envtronment. Data infugitive emissions should be regu arly collected and recordmaintained.Complied w th2 (vi) Finally treated effluent should conform to the standards Complied with.prescrrbed under the EPA, 1986 and recycled back to themaxirnum extent possible. There should be no dischargefrom the com plex.2 (vii) Guard pond (s) of sufficientholdingcapacity should beprovided to cope-up with the effluents discharged dur ngmalfunction ing of ETP.Complied with.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!