28 Start-up<br />
Full speed ahead for three-shift operation: starting up and ramping up of the line<br />
Knowing that time is money, a quick ramp-up is the foremost<br />
objective of all plant operators. Our core competence includes car-<br />
rying out the start-up and ramp-up processes in the shortest time<br />
possible so that the plant can quickly start three-shift operation.<br />
Three <strong>Siempelkamp</strong> teams bring out the best in your plant:<br />
Mechanical, electrical as well as technological commissioning is<br />
carried out through our specialists in a professional and closely<br />
Your benefit:<br />
• steep and stable ramp-up curve<br />
• time savings = budget savings<br />
monitored manner so that the ramp-up can follow right after. Startup<br />
periods of less than six weeks from the beginning of commissioning<br />
to full production are not rare. So you will save time and money<br />
providing a cutting edge to your business.<br />
Left: Start-up<br />
Right: The first produced board<br />
Ramping up the line<br />
Top: Maintenance<br />
Center and bottom: Modification and upgrading