A Publication of the Asian Research JournalsAJMRAsian Journal of Multidimensional ResearchVol.1 Issue 1, June 2012, ISSN 2278-4853Harvest<strong>in</strong>gBakhor andDanghilHorticulture 14 14 - 3,69,000 2,17,440 (59.00) 62,074Total 112 294 699 39,36,000 36,57,537 (92.93) 2,78,463Jalagam Vikas Sangh Giri River North 3-4TikkarJathanaTikkarEntry Po<strong>in</strong>tActivitySoilConservationWaterHarvest<strong>in</strong>g04 04 - 1,75,200 1,75,200 (100.0) -22 153 201 10,08,000 9,66,000 (95.84) 42,00053 55 368 17,06,700 15,65,255 (91.54) 1,44,445Nagali Horticulture 14 14 - 1,61,300 1,41,000 (87.42) 20,300Total 93 226 569 30,51,200 28,44,455 (93.23) 2,06,745Jalagam Vikas Sangh Giri River North 2KatharTeliKanauriEntry Po<strong>in</strong>tActivitySoilConservationWaterHarvest<strong>in</strong>g02 02 - 1,11,000 1,11,000 (100.0) -11 126 131 6,51,400 6,37,400 (97.86) 14,00020 16 215 8,87,300 8,51,300 (95.95) 36,000Asian Research Journalshttp://www.<strong>tarj</strong>.<strong>in</strong>26
A Publication of the Asian Research JournalsAJMRAsian Journal of Multidimensional ResearchVol.1 Issue 1, June 2012, ISSN 2278-4853Kanauri Horticulture 02 02 - 1,25,000 1,11,265 (89.01) 13,735Total 35 146 346 17,74,700 17,10,965 (96.40) 63,735Grand Total 319 1,162 2,188 1,16,82,900 1,11,33,956 (95.30) 5,48,940Source: 1. Block Development Office, Kandaghat and Field Survey 20092. The figures <strong>in</strong> the parenthesis <strong>in</strong>dicate percentage (%)Table VI reveals that Jalagam Vikas Sangh Ashwani River North-3 has exceptionally achieved maximum work component i.e.(79) with (100.00 per cent) f<strong>in</strong>ancial achievement and constructed (496) structures of soil conservation and water harvest<strong>in</strong>g and entrypo<strong>in</strong>t activities. The another NGO is Giri River North-2 with (96.40 per cent) f<strong>in</strong>ancial achievement with (35) works and 146structures of soil conservation and water harvest<strong>in</strong>g, followed by Giri River North 3-4 with (93.23 per cent) f<strong>in</strong>ancial achievement and(93) work components and (226) structures, followed by Ashwani River North-4 with (92.93 per cent) f<strong>in</strong>ancial achievement and (112work component) and (294) structures. It can be concluded that all the four selected watershed NGOs have achieved (95.30 per cent)f<strong>in</strong>ancial achievement with (319) work components and (1,162) structures and covered an area of (2,188) hectares which shows thatall the NGOs have performed up to the mark and has done remarkable job <strong>in</strong> the field of watershed programmes.Detail of watershed-wise physical targets achieved dur<strong>in</strong>g the study period <strong>in</strong> sample watershed NGO is given <strong>in</strong> the table VII.Asian Research Journalshttp://www.<strong>tarj</strong>.<strong>in</strong>27