44. Emergency Works: In the even of any accident or failure occurring in or about the work orarising out of or in connection with the construction, completion or maintenance of theworks which in the opinion of Engineer requires immediate attention, the Railway maybring its own workmen or other agency to execute or partly execute the necessary work orcarry out repairs if the Engineer considers that the contractor/s is/are not in a position todo so in time and charge the cost thereof, as to be determined by the Railways to theContractor.45. Site facilities:45.1 The Railway will not arrange any approach roads to the site of the work. Thecontractor shall arrange to provide and maintain the same at his own cost. Howeverthe Railway may assist in securing right as way for service roads/camp sites withoutany liability therefore. All payments involved in this regard will have to be made bythe contractor direct to owners.45.2 Before locating the Contractor’s sheds, stores, camp <strong>office</strong>, yards etc. in theRailways premises, the locations should be got approved by the Engineer-in-charge.For this purpose, land as available and can be spared will be given free of charge forthe period of work only. On completion of work, the Contractor shall leave the sitefree of all structures/debris etc.46. Time is the Essence of Contract.: Time is the essence of contract. All the works arerequired to be completed in all respects as stipulated by the Railway within the completionperiod. Progress shall be maintained strictly in accordance with the programme given bythe Engineer-in-charge from time to time and as per accepted CPM net work/PERT charts.47. The rates quoted by the tenderer and accepted by the Railway shall hold good till thecompletion of the work and no additional, individual claim shall be admissible on accountof fluctuation in market rates, increase in taxes/any other levies/tolls etc. It shall be notedthat whether any reference to code, specification, act etc, is made in this tender document,it shall be taken as a reference to the latest version thereof. Including all amendments andcorrections etc.48. The contractor shall not be entitled to any extra payment on any account for compliancewith the various provisions of IS specifications /IRS specification and additional specialconditions. The rates indicate in the schedule shall be deemed to include all worksrequired to be done in compliance with the specifications.49. Sales Tax or any other Taxes: The contractor shall bear in full any sales tax and/or othertaxes levied by the State Government and/or Central Government from time to time. Thiswould be entirely a matter between the Contractor and State Government or Central andno claim what-so-ever on the on this account shall be entertained by the Railway.50. Rates: It is to be clearly noted that the accepted rate for the items of work as set forthherein and as described in the Schedule of rates and quantities includes the cost of allworks incidental to their execution.51. The contractor shall arrange for all skilled and unskilled labour required for the work asalso for all materials tools and plants. The contractor shall also arrange for all petty andconsumerable spares required for working the plant.9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!