appendix 5 â project fiche template - European Commission - Europa
appendix 5 â project fiche template - European Commission - Europa
appendix 5 â project fiche template - European Commission - Europa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Develop and enforce relevant regulatoryframework in order to increase sustainableenergy use, especially in transport sector• 20 % increase of general public• Final awareness raising surveyaware of obligations regardingon general publicenergy use in transport sector by theend of the <strong>project</strong>• Final awareness raising survey• 10% increase of general public ready on general public and <strong>project</strong>to implement measures of sustainable report and recordsenergy use by 2015• National statistics on energy• Renewable energy consumption in consumption and specificallytransport increased at least 1 % by in transport sector2015 9 (MONSTAT)• No major changes in EUenergy policy• Parliament adopting thedeveloped legislation in duetime• Government commitment andreadiness to implementlegislation• Consumers ready andinterested to implementlegislation• Implementing structuresequipped to enforcelegislationResults: Objectively verifiable indicators: Sources of Verification: Assumptions:Sustainable energy use in transport sector1. RES and EE potential assessed and Actionplan with top priority measures forsustainable use of energy in transportsector preparedSustainable energy use in transport sector• 3 studies completed by the end ofsecond quarter from <strong>project</strong> start andan Action plan developed by the endof the fifth quarter from <strong>project</strong> startand adopted by the end of the sixthquarter from the start of the <strong>project</strong>• Guidelines and top priority measuresSustainable energy use in transportsector• Project records and reports• Stability of administrativestructures• Cooperation with otherbeneficiaries• Parliamentary programmeincludes the legislation onenergy efficiency and9 Specific % increase should be revised based on the initial studies of potential at the Inception phase of the <strong>project</strong>