Coachella Canal Eng<strong>in</strong>eer<strong>in</strong>g Data• <strong>Construction</strong> period 1938-1948• Length 123 mi• Diversion capacity 2,500 cfs• Typical section, earth l<strong>in</strong>ed:• Bottom width 40-60 ft• Side slopes 2:1• Water depth 10.3 ft• L<strong>in</strong><strong>in</strong>g, clay-blanket 12 <strong>in</strong>• Typical section, concrete l<strong>in</strong>ed:• Bottom width 12 ft• Side slopes 1.5 :1• Water depth 10.8 ft• L<strong>in</strong><strong>in</strong>g thickness 3.5 <strong>in</strong>