13.07.2015 Views

Final Inspection Report and Certification - Department of Commerce

Final Inspection Report and Certification - Department of Commerce

Final Inspection Report and Certification - Department of Commerce

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Blower Door DiagnosticsBUILDING TIGHTNESS TESTINGZONAL PRESSURE DIAGNOSTICSRing Setting: Open Ring A Ring B Zone Tested FINAL TEST Zone Tested FINAL TESTPa CFM50 Attic 1 Cavity b/w FloorsINITIAL TEST: Attic 2 CrawlspaceINTERIM TEST: Knee Wall: N S E W MH BellyFINAL TEST: Knee Wall: N S E W Basement<strong>Final</strong> IR Camera/Visual <strong>Inspection</strong> identify additional primary air sealing is required? Yes NoZonal pressure diagnostics identify zones where additional primary air sealing is required? Yes NoAir sealing work performed from unconditioned space rather than from conditioned space? Yes NoAir sealing work visible from conditioned space, reflects a neat appearance/quality workmanship? Yes NoAir sealing work performed in error, such as air sealing between two conditioned/unconditioned spaces? Yes NoPASSFAILCOMMENTS:PRESSURE PAN/DUCT TIGHTNESS TESTING (Duct WRT House) House WRT Duct Location ___/___ Pa# Location FINAL # Location FINAL # Location FINAL1 6 112 7 123 8 134 9 1 Return5 10 2 ReturnDuctwork located in unconditioned space insulated per st<strong>and</strong>ard? Yes NoAll supply registers/grilles functional, free <strong>of</strong> duct sealing residue, <strong>and</strong> easily removed by h<strong>and</strong>? Yes NoMobile Home duct runs compliantly blocked to limit excess run lengths? Yes NoPASSCOMMENTS: (Record compelling written justification for any FINAL reading <strong>of</strong> < 1.0 Pa)FAILRoom Pressure BalancingINDIVIDUAL ROOM PRESSURES(Individual room pressures may not exceed -/+ 3 Pa WRT Outside)Room <strong>Final</strong> Room <strong>Final</strong> Room <strong>Final</strong>1 3 52 4 6Pressure balancing measures performed? Yes No Measure Type: Jump Ducts Door cuts OtherIf yes, work reflects quality workmanship? Yes No Location/Qty Installed:COMMENTS:PASS FAIL <strong>Final</strong> <strong>Inspection</strong> <strong>and</strong> <strong>Certification</strong> <strong>of</strong> Services Complete Page 6 <strong>of</strong> 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!