<strong>NBN</strong> <strong>Co</strong> <strong>Preparation</strong> <strong>and</strong> <strong>Installation</strong> <strong>Guide</strong> <strong>for</strong> <strong>SDUs</strong> <strong>and</strong> <strong>MDUs</strong> Post Building <strong>Co</strong>mpletion <strong>Installation</strong><br />

Appendix B – Activity Matrix<br />

The following shows the installation life-cycle of fibre telecommunication equipment in New<br />

Developments. Highlighted (in orange) is the section that this document encompasses.<br />

Activity Responsible Party Timing<br />

<strong>Installation</strong> of estate pit <strong>and</strong> conduit Estate Developer Prior to building commencement<br />

<strong>Installation</strong> of estate fibre FTTP solution provider Prior to building commencement<br />

<strong>Co</strong>nnection of estate fibre to the <strong>NBN</strong> FTTP solution provider Prior to building commencement<br />

<strong>Installation</strong> of the service drop conduit<br />

stub<br />

Building design to accommodate fibre<br />

equipment <strong>and</strong> wiring<br />

<strong>Installation</strong> of the service drop conduit<br />

<strong>and</strong> draw-string<br />

FTTP solution provider Prior to building commencement<br />

Builder Prior to building commencement<br />

Builder During base / slab stage<br />

Pre – Install Request submitted Builder After lock-up stage<br />

<strong>Installation</strong> of power to the PSU<br />

location<br />

Builder During building wiring<br />

<strong>Installation</strong> of internal conduit Builder During building wiring<br />

<strong>Installation</strong> of pre-wired customer<br />

wiring<br />

Builder / Owner During building wiring<br />

<strong>Installation</strong> of NTD <strong>NBN</strong> <strong>Co</strong> After lock-up stage<br />

<strong>Installation</strong> of PSU <strong>NBN</strong> <strong>Co</strong><br />

After lock-up stage ...<strong>and</strong> when<br />

mains power to the premises has<br />

been connected <strong>and</strong> turned on<br />

<strong>Installation</strong> of PCD <strong>NBN</strong> <strong>Co</strong> After lock-up stage<br />

<strong>Installation</strong> of FWO <strong>NBN</strong> <strong>Co</strong> After lock-up stage<br />

<strong>Installation</strong> of service drop cable fibre<br />

to PCD<br />

<strong>Co</strong>nnection of service drop cable fibre<br />

from PCD to NTD<br />

<strong>NBN</strong> <strong>Co</strong><br />

<strong>NBN</strong> <strong>Co</strong><br />

After lock-up stage<br />

After lock-up stage<br />

<strong>Co</strong>nnection of PSU wiring to NTD <strong>NBN</strong> <strong>Co</strong> After lock-up stage<br />

<strong>Co</strong>nnecting pre-wired customer wiring<br />

to NTD<br />

Owner / Service Provider After lock-up stage<br />

Activation of communication services Owner / Service Provider After order from RSP received<br />

<strong>Installation</strong> of additional customer<br />

wiring (optional)<br />

<strong>Co</strong>nnection of additional customer<br />

wiring to NTD (optional)<br />

Owner<br />

Owner<br />

As required during or after<br />

building construction<br />

As required during or after<br />

building construction<br />

Uncontrolled when printed.<br />

Final Version 5.0 <strong>Co</strong>mmercial in <strong>Co</strong>nfidence <strong>NBN</strong>-NO-GDE-0011<br />

23 Mar 2012 © 2012 <strong>NBN</strong> <strong>Co</strong> Ltd Page 16 of 17