13.07.2015 Views

Conversion of the WSU reactor to a mixed core of TRIGA- FLIP and ...

Conversion of the WSU reactor to a mixed core of TRIGA- FLIP and ...

Conversion of the WSU reactor to a mixed core of TRIGA- FLIP and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The <strong>the</strong>rmal flux levels in <strong>the</strong> most commonly used experimentalfacilities increased between 257o <strong>and</strong> 307 o as a result<strong>of</strong> <strong>the</strong> conversion. Measurements made with a self-powered neutrondetec<strong>to</strong>r indicated a peak flux <strong>of</strong> ~8.5 x 1012nv in <strong>the</strong>vertical wet tube located in Grid Position D-8. Measurementsin <strong>the</strong> same position prior <strong>to</strong> <strong>the</strong> <strong>core</strong> change revealed a level12<strong>of</strong> ^6.0 x 10 nv at <strong>the</strong> peak. The improvement <strong>of</strong> <strong>the</strong> experimentalfacility flux level met <strong>the</strong> anticipations from preconversioncalculations <strong>and</strong> analysis.Operation <strong>of</strong> <strong>the</strong> <strong>reac<strong>to</strong>r</strong> since initial startup with <strong>the</strong><strong>mixed</strong> <strong>core</strong> has <strong>to</strong>talled only forty megawatt-days. The rate <strong>of</strong>excess reactivity loss over this operating period has beencalculated at $0,011 per megawatt day, reflecting <strong>the</strong> accumulation<strong>of</strong> primary poisons in <strong>the</strong> <strong>FLIP</strong> fuel. More data fromcontinuing operations will be necessary <strong>to</strong> determine an equilibriumrate <strong>of</strong> excess loss.In summary, <strong>the</strong> observed performance <strong>of</strong> <strong>the</strong> <strong>mixed</strong> <strong>core</strong>has been quite satisfac<strong>to</strong>ry <strong>and</strong> analysis has indicated nosignificant deviations from <strong>the</strong> design predictions <strong>and</strong> specifications.No major operational problems have developed since<strong>the</strong> conversion was completed.3-25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!