13.07.2015 Views

Mohamed Hegab, PhD, PE, MRICS, PMP - The Dispute Board ...

Mohamed Hegab, PhD, PE, MRICS, PMP - The Dispute Board ...

Mohamed Hegab, PhD, PE, MRICS, PMP - The Dispute Board ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Hegab</strong>, M., Smith, G., and Salem, O. (2006) "Soil Penetration Modeling in Microtunneling Projects." ASCE Journal ofConstruction Engineering and Management,132(6).Nassar, K., and <strong>Hegab</strong>, M. (2006). "Developing a Complexity Measure for Project Schedules ". ASCE Journal ofConstruction Engineering and Management, 132(6).Nassar, K., Nassar, W. and <strong>Hegab</strong>, M. (2005). "Evaluating Cost Overruns of Asphalt Paving Project Using SPCMethods." ASCE Journal of Construction Engineering and Management, 131(11).Nassar, K., Gunnarsson, H., and <strong>Hegab</strong>, M. (2005). "Using Weibull Analysis For Evaluation of Cost AndSchedule Performance." ASCE Journal of Construction Engineering and Management, 131(12).<strong>Hegab</strong>, M., and Nassar, K. (2005). "Decision Support System for Commencement Delay Claims." ASCEJournal of Practice Periodical on Structural Design and Construction, 10(3), August 2005, pp. 177-180.<strong>Hegab</strong>, M., Yazdani, S., Ghaith, H., and El-Hashemy, H. M. (2005). “Experimental Study on the Effect ofSpliced Reinforcement in High Strength Concrete Beams.” Journal of Advances in Structural Engineering, 8(1),January 2005, pp. 45-53.<strong>Hegab</strong>, M., and Salem, O. (2004). "Productivity Analysis for Boulac's Wastewater Microtunnels in Egypt."ASCE Journal of Practice Periodical on Structural Design and Construction, 9(2), May 2004, pp. 116-120.Salem, O., and <strong>Hegab</strong>, M. (2001). “Contractual Risk Identification and Mitigation in Microtunneling andTrenchless Technology Projects: No-Dig Engineering Journal,” Vol. 8, No.3, 4 th Quarter 2001, pp.5-9.Referred Conference Papers<strong>Hegab</strong>, M. and Nassar, K. (2008).” Budgeting Design Costs for Transportation Projects using Probabilistic Analysis”Proceeding of the Association of Egyptian American Scholars (AEAS) 35th Annual Conference, Cairo, Egypt, December 27-29Nassar, K, and. <strong>Hegab</strong>, M. (2008).” Evaluating Contractor Performance: Application to the UAE Construction Industry”Proceeding of ASCE 5th International Engineering and Construction Conference (IECC’5), Irvine, Ca, August 27-29.Nassar, K, and. <strong>Hegab</strong>, M. (2007).” Planning and Using a Work Breakdown Structure in Construction Projects” Proceeding ofthe Association of Egyptian American Scholars (AEAS) 34th Annual Conference, Long Beach, Ca, Egypt, December 14-16<strong>Hegab</strong>, M., and Nassar, K. (2006). "Stochastic Prediction of Design Costs for Transportation Projects." Associated Schoolsof Construction: Proceedings of the 42nd Annual Conference, Colorado State University - Fort Collins, Colorado, April 20 -22, 2006.Nassar, K, and. <strong>Hegab</strong>, M. (2006). " RAP Detection and Quantity Determination in US Asphalt Pavements." AssociatedSchools of Construction: Proceedings of the 42nd Annual Conference, Colorado State University - Fort Collins, Colorado,April 20 - 22, 2006.S. Yazdani, J. Maxwell, and M. <strong>Hegab</strong> (2005)."Equivalency of strain and stress space formulation in the modeling ofnonlinear behavior of concrete and mortar materials."Proceedings of the 3rd International Structural Engineering andConstruction Conf. Shunan, Japan, 2005Nassar, K., <strong>Hegab</strong>, M., and Jack, N. (2005). "Design Cost Analysis of Transportation Projects." Proceedings of ConstructionResearch Congress 2005: Broadening Perspectives, April 5.7, 2005, San Diego, CA.<strong>Hegab</strong>, M. (2005). "Prediction of Productivity for Microtunneling Projects in Bidding Phase." Proceedings of ConstructionResearch Congress 2005: Broadening Perspectives, April 5.7, 2005, San Diego, CA.<strong>Hegab</strong>, M., and Smith, G. (2003). “Prediction Modeling of Microtunneling Projects.” Construction Research Council:Research Symposium, ASCE, Nashville, Tennessee, November 12-15.Salem, O., and <strong>Hegab</strong>, M. (2001). “Risk Management in Trenchless Technology Construction.” Proceedings of TrenchlessEgypt, No-Dig 2001, Cairo, Egypt, Feb. 26-28.<strong>Hegab</strong>, M.Y., Gheith, H. H., and El-Hashemy, H. M. (1999). “Effect of Lap Splice on the Behavior of High StrengthConcrete Beams.” Proceedings of <strong>The</strong> Regional Conference & 2 nd International Symposium on Environmental Hydrology,16-18 May, 1999, Cairo, Egypt, ASCE-Egypt Section, pp.199-206.<strong>Hegab</strong> Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!