Control Flow Testing - Software Engineering: Dependability
Control Flow Testing - Software Engineering: Dependability
Control Flow Testing - Software Engineering: Dependability
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Control</strong> <strong>Flow</strong> <strong>Testing</strong>Boundary Interior Test<strong>Software</strong> Quality Assurance – Dynamic Test© Prof. Dr. Liggesmeyer• 2. Boundary test casesa. The execution with totalnumber = 0 and the input of the character string A1 causes the enteringof the loop body, the execution of the true-branch of the selection, and subsequently thetermination of the looptest path: n start , n 1 , n 2 , n 3 , n 4 , n 5 , n 2 , n finalb. The execution with totalnumber = 0 and the input of the character string B1 causes the enteringof the loop body, the execution of the false-branch of the selection and subsequently thetermination of the looptest path: n start , n 1 , n 2 , n 3 , n 5 ,n 2 , n final39