- Page 3: Course ObjectiveTo make the verifie
- Page 8 and 9: III. Rules and Regulation forETS ve
- Page 10 and 11: Verifier & Operator Operator is the
- Page 12 and 13: Reporting format Emission report1.
- Page 14: IV. Introduction verificationproces
- Page 17 and 18: Verifier (EA 6/03)Responsible for t
- Page 19 and 20: Steps in verification process1. Pre
- Page 21 and 22: Step 2: Verification assessmentConc
- Page 23 and 24: Step 2: Verification assessment2.2.
- Page 25 and 26: Step 2: Verification assessment2.3.
- Page 27 and 28: Step 2:Verification assessment2.4.
- Page 29 and 30: Step 2: Verification assessment2.4.
- Page 31 and 32: Step 2: Verification assessment2.4.
- Page 33 and 34: Step 4: Review of verification proc
- Page 35 and 36: V. Practical issue:strategic and ri
- Page 37 and 38: Strategic & risk analysis 1Assessme
- Page 39 and 40: Strategic & risk analysis 3Develop
- Page 41 and 42: Case study on risk analysis Case: P
- Page 43 and 44: System VerificationEmissions fromac
- Page 45 and 46: Reasonable level of assuranceVerifi
- Page 47 and 48: Verification report Verification re
- Page 49 and 50: What if… A material omission is f
- Page 51 and 52: One or more non material mistake(s)
- Page 53 and 54: Source not mentioned in MPSeveral a
- Page 55 and 56:
Content Verification report (1)Basi
- Page 57 and 58:
Conclusion verification Emission re
- Page 59 and 60:
Content management report Backgroun
- Page 61 and 62:
VII. Competence of verifiersand oth
- Page 63 and 64:
Qualifications verifier personnel N
- Page 65 and 66:
Special scopes for certain sectors1
- Page 67 and 68:
EA 6/03Competence evaluationVerifie
- Page 69 and 70:
VIII. Internal qualitymanagement ve
- Page 71 and 72:
IX. Planning & Communication71
- Page 73 and 74:
Planning verification(s)The main st
- Page 75 and 76:
Planning verifications year xMake I
- Page 77 and 78:
Communication verification year xTi
- Page 79 and 80:
Content of Rep letterResponsible Ma
- Page 81 and 82:
Executing audit plan/interviews on
- Page 83 and 84:
System Verification (Pre) investiga
- Page 85 and 86:
System VerificationEmissions fromac
- Page 87 and 88:
Amount of testing1. Percentage of i
- Page 89 and 90:
System verification in practice Man
- Page 91 and 92:
Serious omissions found duringsyste
- Page 93 and 94:
Amount of testing1. Percentage of i
- Page 95 and 96:
Amount of testing3. In case of grea
- Page 97 and 98:
Analysing data spreadsheets - Data-
- Page 99 and 100:
Analysing data spreadsheets - Formu
- Page 101 and 102:
Programme for analysing data filesW
- Page 103 and 104:
Analysing data files: groups of for
- Page 105 and 106:
Analysing data files : relation bet
- Page 107 and 108:
XII. Approach simple andcomplex ins
- Page 109 and 110:
What determines an installation to
- Page 111 and 112:
Example complex installationInstall
- Page 113 and 114:
Strategic & risk analysis Simple in
- Page 115 and 116:
System verification Simple installa
- Page 117 and 118:
Issuing verification report Simple
- Page 119 and 120:
XIII Case studies1. Pre contract st
- Page 121 and 122:
Case study 1Internal verification d
- Page 123 and 124:
What information is part of: Corres
- Page 125 and 126:
Relevant correspondence installatio
- Page 127 and 128:
Case study 2: Review127
- Page 129 and 130:
Case study review Basis for review:
- Page 131 and 132:
WI 400Stap 7: ReviewOordeel inzake
- Page 133 and 134:
Example of items to be part of theW
- Page 135:
Course evaluation / discussion …