13.07.2015 Views

Shipbuilding and Conversion, Navy

Shipbuilding and Conversion, Navy

Shipbuilding and Conversion, Navy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CLASSIFICATION: UNCLASSIFIEDShip Type:CARRIER REPLACEMENT PROGRAMEquipment Item: DUAL BAND RADAR (DBR) (SPY-3 AND VSR)PARM Code:IWS2RASHIPBUILDING AND CONVERSION, NAVYP-35 EXHIBITMAJOR SHIP COMPONENT FACT SHEETFY 2011 President's Budget(Dollars in Thous<strong>and</strong>s) February 2010I. DESCRIPTION/CHARACTERISTICS/PURPOSE:The DBR suite performs horizon <strong>and</strong> volume search functions during which the system can detect stealthy targets in sea-l<strong>and</strong> clutter, provide periscope detection, <strong>and</strong> counter batteryfunctions. The dual b<strong>and</strong> approach (wave form integration) has the ability to provide improved performance in adverse environments, demonstrate avoidance of multi-radar track-to-trackcorrelation <strong>and</strong> provides for reduced software development <strong>and</strong> maintenance. The SPY-3 function provides an affordable, high-performance radar for the ships defense. SPY-3 greatly enhancesship defense capability against all surface <strong>and</strong> air threats envisioned in the littoral environment. VSR provides a solid state active phased array with low signature <strong>and</strong> athree-dimensional air search capability. The VSR function also provides long range above the horizon surveillance, detection, <strong>and</strong> tracking of high diving targets, <strong>and</strong> provides the SPY-3with timely cueing <strong>and</strong> aircraft marshalling assistance.II. CURRENT FUNDING:P-35 Category FY 2008QTY COSTMajor HardwareSparesSystems EngineeringTechnical Engineering ServicesOther CostsTotal1 244,4712,50013,8005,30020,526286,597III. CONTRACT DATA:PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWAREYEARFY 08TYPECVN 78CONTRACTORRAYTHEONTYPECPIFDATEVARIOUS/OPTION QTY1UNIT COST244,471IV. DELIVERY DATE:PROGRAM SHIP EARLIEST SHIP MONTHS REQUIRED PRODUCTION REQUIREDYEAR TYPE DELIVERY DATE BEFORE DELIVERY LEADTIME AWARD DATEFY 08 CVN 78 SEP-15 53 18 OCT-09V. COMPETITION/SECOND SOURCE INITIATIVES:NoneNOTE:CLASSIFICATION:1-26 UNCLASSIFIED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!