13.07.2015 Views

Detention Basin Retrofits and Maintenance - Rutgers Cooperative ...

Detention Basin Retrofits and Maintenance - Rutgers Cooperative ...

Detention Basin Retrofits and Maintenance - Rutgers Cooperative ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The Catchbasin StormFilter SystemSystem Features <strong>and</strong> Benefits• Targets site-specific pollutants• Low cost, heavy gauge, all steel construction(Concrete units also available)• Internal bypass that minimizes re-suspensionof trapped pollutantsGeneral Specifications• StormFilter capacity ­ 15 gpm/cartridge (upto 4 cartridges)• Peak hydraulic capacities:St<strong>and</strong>ard Steel Units -­ 1.0 cfsDeep Steel Units - 3.0 cfsConcrete Units - 2.0 cfs• Hydraulic drop (Rim to Invert):­St<strong>and</strong>ard Steel Unit - 2.3'Deep Steel Unit - 3.3'Concrete Unit - 2.75' to 2.9' "• Outlet pipe diameter ­ up to 12"• Load-bearing capacities:Concrete Units - H-20Steel Units - H-20 with concrete collar

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!