13.07.2015 Views

Guidelines and Check-list for evaluation of MSW Landfills proposals ...

Guidelines and Check-list for evaluation of MSW Landfills proposals ...

Guidelines and Check-list for evaluation of MSW Landfills proposals ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.3 L<strong>and</strong>fill site <strong>of</strong> Karwar (Karnataka):Karwar is the Head Quarter <strong>of</strong> Uttar Kannada Dsitrict <strong>and</strong> is one <strong>of</strong> the famous touristplaces in Karnataka along the Arabian Sea-shore. The famous sea-bird project is locatedhere. Karwar town is considered under KUDCEMP, which is bestowed with gentle wave,miles <strong>of</strong> golden s<strong>and</strong>, tranquil ambience <strong>and</strong> acres <strong>of</strong> emerald foliage. Karwar town issituated just 100 Km away from Goa that makes good starting point <strong>for</strong> voyage <strong>of</strong>discovering the thrills <strong>of</strong> sea, s<strong>and</strong> <strong>and</strong> the Sun.Population : 67,411 (2005)Municipal Area: 27.15 Sq. Km.Solid Waste Generation : 23 TPDNumber <strong>of</strong> wards : 31Average Annual Rainfall : 3800 mmTemperature: Min m : 20 0 C <strong>and</strong> Max m : 39 0 CClimate: Heavy rainfall in Monsoon <strong>and</strong> Characterized by highhumidity <strong>and</strong> temperature.Details <strong>of</strong> L<strong>and</strong>fill Site:The l<strong>and</strong>fill site is located at Shirwad Village around 4 km away from Karwar. The totall<strong>and</strong>fill site area is 6 Acres, approval <strong>of</strong> an additional area <strong>of</strong> 5 Acre is pending withDOEE. The construction is done through contract tendering by KUIDFC. The l<strong>and</strong>fill wascommissioned in August 2005.Design Aspect: The l<strong>and</strong>fill area is designed <strong>for</strong> 25 years <strong>of</strong> life with total capacity <strong>for</strong>l<strong>and</strong>filling 89,770 Tonnes <strong>of</strong> <strong>MSW</strong>.• L<strong>and</strong>fill: 6600 Sq.meter area designated <strong>for</strong> dumping. The inner bottom dimension<strong>of</strong> the l<strong>and</strong>fill cell is 140m X 42m. There is a 2m height <strong>of</strong> earthen -embankmentwith 3:1 slope, bottom 90cm thick soil liner having coefficient <strong>of</strong> permeability lessthan 1 X 10 -7 cm/sec, overlaid by 1.5 mm thick high Density Poly Ethylene (HDPE)liner <strong>of</strong> 11 years life.• Leachate Collection <strong>and</strong> treatment: Quantity <strong>of</strong> leachate generation is 540 cum perday by considering peak rainfall, collection <strong>of</strong> leachate through a per<strong>for</strong>ated HDPEpipe (48 slots per meter, 60mm X 3 mm size) network above the HDPE liner. Pipesare laid over 10cm thick s<strong>and</strong> layer. To avoid choking a 20cm thick graded pebble(40mm down size) layer over the HDPE pipes has been provided. Leachate will bein an anaerobic pond (5 days detention time, having dimension 81m X 23.5m attop with liquid depth <strong>of</strong> 4m) followed by stabilization pond (1 day detention time,having dimension 27.5m X 25.5m at top with liquid depth <strong>of</strong> 1.5 m) be<strong>for</strong>e finaldisposal.• Catch Drains & Roads: 725m length <strong>of</strong> laterite stone masonry drain (0.5m X 0.5m)is constructed to safely divert all storm water around the site. 350m long asphaltedapproach road, 3m wide WBM road <strong>for</strong> internal use.• Administrative Block: Inclined RCC ro<strong>of</strong> structure <strong>of</strong> 82 sq.m to accommodate an<strong>of</strong>fice room <strong>for</strong> a sanitary supervisor to facilitate maintenance <strong>of</strong> records, monitor33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!