13.07.2015 Views

Ultraplan 1 Plus specifications (PDF) - GBL Construction

Ultraplan 1 Plus specifications (PDF) - GBL Construction

Ultraplan 1 Plus specifications (PDF) - GBL Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

aggregate (up to 30% by weight) can be added directlyto <strong>Ultraplan</strong> 1 <strong>Plus</strong> during mixing.Note: Use only clean, stable aggregates. Do not uselimestone or other potentially reactive aggregates forextension.10. <strong>Ultraplan</strong> 1 <strong>Plus</strong> quickly hardens, within 2 to 3 hours,and is ready to accept installation of ceramic tile andnatural stone in as little as 3 to 4 hours (moisturesensitivestone can require more curing time). Floorcoverings – such as carpet, vinyl sheet goods, vinyl tile,VCT, homogenous PVC, rubber and engineered woodplank – can typically be installed 16 to 24 hours afterapplication. Protect the surface from contaminants untilthe final flooring installation is complete. All of the abovestatements are subject to real-time jobsite temperaturesand humidity conditions.Curing1. <strong>Ultraplan</strong> 1 <strong>Plus</strong> is self-curing; do not use a dampcuringmethod or curing and sealing compounds.2. Protect <strong>Ultraplan</strong> 1 <strong>Plus</strong> from excessive heat or draftconditions during curing. Turn off all forced ventilationand radiant heating systems, and protect installation forup to 24 hours after completion.3. Avoid walking on installed surface for at least 2 to 3hours after installation, depending upon temperature andhumidity conditions.4. Protect installation from traffic, dirt and dust from othertrades until <strong>Ultraplan</strong> 1 <strong>Plus</strong> is completely cured andfinal flooring has been installed.5. Do not expose <strong>Ultraplan</strong> 1 <strong>Plus</strong> to rolling dynamic loads,such as fork lifts or scissor lifts, for at least 72 hoursafter installation.CleaningWash hands and tools with water promptly before materialhardens. Cured material must be mechanically removed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!