13.07.2015 Views

Paint Specifications and Instructions

Paint Specifications and Instructions

Paint Specifications and Instructions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Crown Central LLCPAINT SPECIFICATIONSGeneral:1. <strong>Paint</strong>ing shall be done as indicated on the drawings <strong>and</strong> paint schedule <strong>and</strong> as specified.Work will include painting <strong>and</strong> finishing of interior <strong>and</strong> exterior exposed items <strong>and</strong> surfacesthroughout the project. Surface preparation, priming <strong>and</strong> finish coats shall be included asspecified.2. Provide primers <strong>and</strong> other undercoat paint produced by same manufacturer as finish coat.Materials:1. Materials are to be delivered to job site in original, new <strong>and</strong> unopened packages <strong>and</strong>containers bearing manufacturer's name <strong>and</strong> label. All materials shall be Sherwin-Williams.Substitutes will not be permitted. All paints shall be mixed in accordance with the attachedpaint schedule.Execution:1. Inspection:Applicator must examine areas <strong>and</strong> conditions under which painting work is to be applied<strong>and</strong> notify contractor in writing of conditions detrimental to the formation of a durable paintfilm.2. Surface Preparation:General: Perform preparation <strong>and</strong> cleaning procedures in accordance with paintmanufacturer's instructions <strong>and</strong> as herein specified, for each particular substrate condition.Provide barrier coats over incompatible primers or remove <strong>and</strong> re-prime as required.Notify Project Engineer in writing of any anticipated problems in using the specifiedcoating systems with substrates primed by others.Remove hardware, hardware accessories, machined surfaces, plates, lightingfixtures, <strong>and</strong> similar items in place <strong>and</strong> not to be finish-painted, or provide surfaceappliedprotection prior to surface preparation <strong>and</strong> painting operations. Remove, ifnecessary, for complete painting of items <strong>and</strong> adjacent surfaces. Followingcompletion of painting of each space or area, reinstall removed items.Clean surfaces to be painted before applying paint or surface treatments. Removeoil, degrease <strong>and</strong> other surface contaminants per SSPC-SP1 prior to mechanicalcleaning per SSPC-SP2 or SP3. Program cleaning <strong>and</strong> painting so thatcontaminants from cleaning process will not fall onto wet, newly-painted surfaces.3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!