Svalbard Global Seed Vault.<br />

3.1.5 Ore h<strong>and</strong>ling, Narvik<br />

Employer: LKAB<br />

Type of project: Ore h<strong>and</strong>ling <strong>and</strong> cleaning of <strong>the</strong><br />

transport system<br />

Location: Narvik Harbour<br />

Realisation period: 1981 <strong>–</strong> 2009<br />

Form of contract: Principal construction contract<br />

Description of project: H<strong>and</strong>ling of ore <strong>and</strong> construction work.<br />

Loading of ships. Transporting approx. 15 <strong>–</strong> 20 million tonnes<br />

of iron ore per year.<br />

3.1.6 Mining operations, Svalbard<br />

Employer: Store Norske Spitsbergen<br />

Grubekompani A/S<br />

Type of project: Logistics services <strong>and</strong> development<br />

Location: Svea <strong>–</strong> Spitsbergen, Norway<br />

Realisation period: 2000 - 2020<br />

Description of project: Svea is located at approximately 78<br />

degrees North (latitude) <strong>and</strong> is isolated due to ice conditions<br />

for 7 <strong>–</strong> 8 months of <strong>the</strong> year. This requires extensive planning<br />

work to get all <strong>the</strong> equipment <strong>and</strong> goods in place before it<br />

freezes. The storage costs are considerable. Performs road<br />

construction, construction of storage facilities, quay facilities,<br />

overnighting, offices, infrastructure services in Svea, fire<br />

<strong>and</strong> rescue services. Transport of approx. 4 million tonnes of<br />

coal per year <strong>and</strong> equally as much loading of coal on to ships.<br />

Transportation of approx. 2 million m 3 uncompacted material.<br />

Complicated project located near <strong>the</strong> North Pole.<br />

3.1.7 Svalbard Global Seed Vault<br />

Employer: Statsbygg on behalf of <strong>the</strong> UN<br />

Type of project: Tunnels <strong>and</strong> mountain halls<br />

Location: Longyearbyen - Spitsbergen, Norway<br />

Realisation period: April 2007 <strong>–</strong> February 2008<br />

Description of project: Construction of <strong>the</strong> world’s largest<br />

warehouse for storage of seed. The rock caverns are driven<br />

into <strong>the</strong> permafrost so that <strong>the</strong> seed will have an even storage<br />

temperature (-18 degrees Celsius.). This is <strong>the</strong> new strongroom<br />

that will protect seed from useful plants from over <strong>the</strong><br />

whole world. It is because of <strong>the</strong> isolated location <strong>and</strong> <strong>the</strong><br />

permafrost that <strong>the</strong> seed store is located at Spitsbergen. The<br />

location takes into consideration all <strong>the</strong> known scenarios for<br />

elevation of <strong>the</strong> sea surface because of global climate changes,<br />

plant diseases, nuclear war, infestation, <strong>and</strong> natural disasters<br />

as, for example, meteorite collision. Complicated project with<br />

difficult geology. Extensive international attention.<br />

3.1.8 Antarctic<br />

Employer: SvalSat/Kongsberg Satelite station<br />

Type of project: Laying foundations <strong>–</strong> logistics<br />

Location: Troll Station - Antarctic<br />

Realisation period: 2004 - 2011<br />

Description of project: LNS performs foundation <strong>and</strong> trenching<br />

work, road building <strong>and</strong> construction of satellite antennas<br />

in <strong>the</strong> vicinity of <strong>the</strong> Norwegian research station Troll. The<br />

company also participates in maintenance of <strong>the</strong> airport as<br />

well as transport of cargo from <strong>the</strong> ice edge <strong>and</strong> in to Troll.<br />

The logistics for <strong>the</strong> project are very complicated <strong>and</strong> <strong>the</strong>re<br />

are strict environmental requirements for all parties.<br />

3.1.9 Rana Gruber <strong>AS</strong><br />

Employer: Rana Gruber As<br />

Project: Galleries<br />

Location: Mo i Rana, Norway<br />

Realisation period: November 2007 <strong>–</strong> November 2009<br />

Description of project: <strong>Leonhard</strong> <strong>Nilsen</strong> & sønner <strong>AS</strong> have <strong>the</strong><br />

principal construction contract for construction of a new main<br />

level for Rana Gruber <strong>AS</strong> iron ore mine in Ørtfjell in Rana. The<br />

work includes opening of approximately 6000 metres of galleries<br />

(approx. 177 000 m 3 rock) <strong>and</strong> rock caverns (approx. 18<br />

000 m 3 ). Ore shall be tipped into crushers <strong>and</strong> waste rock shall<br />

go to waste rock l<strong>and</strong>fills. The galleries are under existing quarries<br />

with extensive rock stresses requiring heavy rock support.<br />

3.2 Reference lately projects<br />

3.2.1 Svea tunnel, Svalbard<br />

Employer: Store Norske Spitsbergen Kullkompani<br />

Type of project: Tunnel<br />

Location: Svea - Spitsbergen, Norway<br />

Realisation period: October 2002 <strong>–</strong> February 2004<br />

Form of contract: Total construction contract<br />

Description of project: 6500 m of access tunnel to <strong>the</strong> mine<br />

Svea Nord. In <strong>the</strong> tunnel shall be installed a conveyor belt<br />

for transport of coal. Complicated project with a very short<br />

construction period, complicated geology <strong>and</strong> difficult logistics.<br />

Svea is isolated because of ice conditions for 7 <strong>–</strong> 8 months<br />

of <strong>the</strong> year. Dem<strong>and</strong>s vast <strong>and</strong> extensive planning. A world<br />

record was set with driving 150.1 m/week with extensive bolt<br />

reinforcement <strong>and</strong> concrete spraying. Average driving was<br />

105 m/week.<br />

3.2.2 Underground mine - iron ore, Sydaranger<br />

Employer: Sydvaranger<br />

Type of project: Development of a new main level<br />

Location: Kirkenes, Norway<br />

Realisation period: 1992 - 1995<br />

Form of contract: Mining construction contract <strong>–</strong> unit<br />

price contract<br />

Value NOK: 200 million<br />

Description of project: Alteration of iron ore mine from<br />

surface quarry to underground operations. Drifting of approx.<br />

3500 m transport gallery with a cross-section of 105 m 2 .<br />

Very extensive rock stresses with stability problems requiring<br />

very heavy rock support. In addition approx. 3000 m drilling<br />

<strong>and</strong> loading galleries were drifted with <strong>the</strong> tunnel cross-section<br />

of 35 m 2 . Training of personnel from <strong>the</strong> <strong>mining</strong> company<br />

Sydvaranger.<br />

3.2.3 Mining operations, Ballangen<br />

Employer: Nikkel og Olivin <strong>AS</strong><br />

Type of project: Underground operations, mine<br />

Location: Ballangen, Norway<br />

Reaslisation time: July 1989 <strong>–</strong> October 2002<br />

Form of contract: Mining construction contract - unit<br />

price contract<br />

Value NOK: 70 million per year<br />

From open pit mine to underground mine for Sydvaranger. LNS in <strong>the</strong> Antarctic.<br />

Difficult rock condition on Icel<strong>and</strong>.<br />

Description of project: 800 000 tonnes of nickel ore per year<br />

400 000 tonnes of waste rock per year. The mine was among<br />

<strong>the</strong> most efficient of its kind in <strong>the</strong> world calculated in tonnes<br />

per employee.<br />

3.2.4 Almannaskard tunnel, Icel<strong>and</strong><br />

Employer: Vegagerdin<br />

Type of project: Road <strong>and</strong> tunnel<br />

Location: Höfn, Icel<strong>and</strong><br />

Realisation period: March 2004 <strong>–</strong> June 2005<br />

Form of contract: Joint Venture <strong>–</strong> unit price contract<br />

Value ISK: 800 million<br />

Description of project: Driving of approx. 1100 m tunnel with<br />

a cross-section of 47 m 2 , construction of approx. 3.5 km road<br />

<strong>and</strong> 165 m tunnel portals. Performance of <strong>the</strong> contract was as<br />

a Joint Venture in co-operation with <strong>the</strong> Icel<strong>and</strong>ic contractor<br />

Heradsverk Ehf. The geological circumstances were complicated<br />

with alternating basalt, scoria <strong>and</strong> tuff. This dem<strong>and</strong>ed<br />

constant changes of rock support <strong>and</strong> extent. LNS set a new<br />

Icel<strong>and</strong>ic record under tunnel driving med 106 m/week.<br />

3.2.5 Hem tunnel, E18, Tønsberg<br />

Employer: Public Roads Administration<br />

Type of project: Tunnel<br />

Location: E18, Solerød<br />

Construction year: 2004<br />

Realisation period: Approx. Sept. 2006<br />

Form of contract: Sub-contract<br />

Value NOK: 95 million<br />

Description of project: Two tunnels of 950 m. Tunnel crosssection<br />

approx. 71 m 2 . Installation complete with water <strong>and</strong><br />

frost protection.<br />

3.2.6 Korgentunnel<br />

Employer: Public Roads Administration<br />

Type of project: Tunnel <strong>and</strong> road construction<br />

Location: Korgen, Norway<br />

Form of contract: Principal construction contract<br />

Value NOK: 193 million<br />

Description of project: Construction of 5800 m of <strong>the</strong> 8600<br />

m long Korgen tunnel. Tunnel cross-section approx. ca. 63 m 2 .<br />

Road construction approx. 4 km. Installation complete with<br />

water <strong>and</strong> frost protection.