13.07.2015 Views

ABSC 03 35 00 Concrete Finishing - Township of Esquimalt

ABSC 03 35 00 Concrete Finishing - Township of Esquimalt

ABSC 03 35 00 Concrete Finishing - Township of Esquimalt

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Township</strong> <strong>of</strong> <strong>Esquimalt</strong> SECTION <strong>03</strong> <strong>35</strong> <strong>00</strong>ARCHIE BROWNING SPORTS CENTRE RENOVATIONCONCRETE FINISHING{ADDENDUM No. 4}Project No. 1233 Page 8 <strong>of</strong> 8.a Sampling, testing and inspection will be carried out by the pre-approved TestingAgency appointed and paid by the Owner..b Work will be carried out in conformance with CSA Standard A23.1.3.8 SCHEDULE OF FINISHES.1 Unformed Surfaces:.a SlabsTrowel finish: After the concrete has been placed, struck-<strong>of</strong>f, consolidated, andscreeded, the surface shall be bull floated and steel troweled to produce a smooth,dense surface with abrupt irregularities no greater than .7 mm (1/32 inch) and out<strong>of</strong>planeness, no greater than 3 mm (1/8 inch) in 3 metres (10 feet). Areas notcomplying with specified tolerances shall be ground until tolerances are met, usingpower grinding equipment.DO NOT USE CURING COMPOUNDS ON SLABS WHERE IT WILL NEGATIVELYEFFECT INSTALLATION OF FLOOR FINISHES..b For Exterior Sidewalks where non-slip finish is required.Broom finish: <strong>Concrete</strong> shall be placed as concrete finish above except afterfloating, shall be given a light broom finish by drawing the broom perpendicular tothe length <strong>of</strong> the sidewalk or slab, leaving a sand textured finish.END OF SECTION <strong>03</strong> <strong>35</strong> <strong>00</strong>Hughes Condon Marler Architects ISSUED FOR ADDENDUM 4, - NOVEMBER 29, 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!