Technical potential (MW)Potential Measure Impact vs. Benefit-Cost Ratio(<strong>Demand</strong> Response Measures)Potential Measure Impact and Benefit-Cost Ratio1,2001,000800600TES measureshave significantpotential but arenot currently costeffectiveCost-effective measureswith moderate potentialinclude most residentialinformation and pricingmeasuresLowest-risk measures includeinterruptible tariffs and DLCfor all segments as well ascurtailable load managementand pricing with enablingtechnology for industrialcustomers400200Lower-potential measures include pricing withtech for commercial and government, plusenabing tech and web portals for residential00.0 1.0 2.0 3.0 4.0 Greater 5.0than 4.0 6.0Benefit-cost ratio18