26.08.2015 Views

Kevin Ryan GWRMP Coordinator USEPA Region 9 (415) 972‐3806 ryan.kevin@epa.gov

UCMR3 Groundwater Representative Monitoring Plans

UCMR3 Groundwater Representative Monitoring Plans

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 8 – EPA’s Review - Continued<br />

Some Key Issues<br />

• Final Rule language changed from Proposed Rule: Proposed Rule<br />

stated the representative well must be one of the higher annual<br />

volume producing and consistently active wells; Final Rule stated “h “the<br />

proposed well must be representative of the highest annual volume<br />

producing and most consistently active wells in the representative<br />

array…”<br />

• Exception to the Rule: if that representative well is not in service at<br />

sampling time, select and sample an alternative representative well<br />

• Importance of selecting a consistently active well, is to minimize the<br />

chance that it will be out of service come sampling time<br />

• Previously approved UCMR2 <strong>GWRMP</strong>s don’t have to contain the<br />

highest producing and most active well –they just have to be<br />

representative of them (see why I call the review a Section 8?)<br />

18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!