31.08.2015 Views

BSOP 330 Week 6 Lab Assignments Chapter 14, problems 14.1, 14.3, 14.9, 14.13 (DEVRY).pdf

For more course tutorials visit www.tutorialrank.com Tutorial Purchased: 2 Times, Rating: B+ BSOP330 Master Planning, Week 5, Problem 1 MASTER PRODUCTION SCHEDULE MAKE-TO-STOCK Beginning PAB prior to week number one is 500. If the forecast is larger than the book orders, complete the MPS using the forecast demand. If the booked orders is larger than the forecast complete the MPS using the booked orders Lead-time for MPS releases is one week. All MPS releases must be in lot sizes of 250 units. Period order coverage is one period. 1. Complete the MPS due line and the MPS released line. 2. Complete the PAB line. 3. Complete the ATP line. BSOP Master Planning, Week 5 Assignment, Problem Two Make-to-Stock MPS

For more course tutorials visit
www.tutorialrank.com
Tutorial Purchased: 2 Times, Rating: B+

BSOP330 Master Planning, Week 5, Problem 1
MASTER PRODUCTION SCHEDULE
MAKE-TO-STOCK
Beginning PAB prior to week number one is 500.
If the forecast is larger than the book orders, complete the MPS using the forecast demand. If the booked orders is larger than the forecast complete the MPS using the booked orders
Lead-time for MPS releases is one week.
All MPS releases must be in lot sizes of 250 units.
Period order coverage is one period.
1. Complete the MPS due line and the MPS released line.
2. Complete the PAB line.
3. Complete the ATP line.
BSOP Master Planning, Week 5 Assignment, Problem Two
Make-to-Stock MPS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

a) Construct a product structure. Identify all levels, parents, and<br />

components.<br />

b) b) Prepare a time-phased product structure.<br />

<strong>Chapter</strong> <strong>14</strong>, <strong>problems</strong> <strong>14</strong>.9<br />

As the production planner for Gerry Cook Products, Inc., you have<br />

been given a bill of material for a bracket that is made up of a base,<br />

two springs, and four clamps. The base is assembled from one<br />

clamp and two housings. Each clamp has one handle and one<br />

casting. Each housing has two bearings and one shaft. There is no<br />

inventory on hand.<br />

Your boss at Gerry Cook Products, Inc., has just provided you with<br />

the schedule and lead times for the bracket in Problem <strong>14</strong>.8. The<br />

unit is to be prepared in week 10. The lead times for the<br />

components are bracket (1 week), base (1 week), spring (1 week),<br />

clamp (1 week), housing (2 weeks), handle (1 week), casting (3<br />

weeks), bearing (1 week), and shaft (1 week). a) Prepare the<br />

time-phased product structure for the bracket. b) In what week do<br />

you need to start the castings?<br />

<strong>Chapter</strong> <strong>14</strong>, <strong>problems</strong> <strong>14</strong>.13<br />

Electro Fans has just received an order for one thousand 20-inch<br />

fans due week 7. Each fan consists of a housing assembly, two<br />

grills, a fan assembly, and an electrical unit. The housing assembly<br />

consists of a frame, two supports, and a handle. The fan assembly<br />

consists of a hub and five blades. The electrical unit consists of a<br />

motor, a switch, and a knob. The following table gives lead times,<br />

on-hand inventory, and scheduled receipts.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!