The Dart
Spring 2012 - St. Sebastian's School
Spring 2012 - St. Sebastian's School
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Grandparents received a frame for the special photo<br />
taken of them with their grandsons.<br />
Being able to spend some time together with<br />
our grandparents was such a joyful experience. We<br />
hope we have more great times like this later on at<br />
school and with our beloved grandparents.<br />
New Math, Science, and Library Center<br />
By Parker Joyce and Jack Doherty<br />
May 12, 2011, was a special day for Saint<br />
Sebastian’s School. May 12 marked the day of<br />
groundbreaking for the new Math, Science and<br />
Library Center. A little over a year later, the<br />
recently completed building blends beautifully into<br />
the existing campus and provides a great sense of<br />
excitement for students and teachers alike. <strong>The</strong><br />
new 32,000 square foot building provides us all<br />
with much-needed space for new math and science<br />
programs and is a beautiful sight to see as you pull<br />
up to the school. Connected to the Academic<br />
Building, the new building consists of eight math<br />
classrooms, two biology labs, two general science<br />
rooms, two chemistry labs, two physics labs, a<br />
computer lab, a reading room, open study, and a<br />
seminar room.<br />
It was fun week to week watching the<br />
building being constructed. <strong>The</strong> sounds of the<br />
work crew and the clatter of construction tools<br />
became a regular part of our lives. <strong>The</strong> crew<br />
worked diligently, and we were all hoping that<br />
work would be completed in time for us to enjoy<br />
the new building for the end of this school year.<br />
Finally, on May 14, 2012, the new building<br />
was open for students to tour and to check out all<br />
of its new features. Grade Seven was assigned to<br />
begin our tour on the first floor, so we got to see all<br />
of the new math rooms and the new science labs.<br />
<strong>The</strong> first thing that caught our eye as we walked<br />
down the wide halls was the vibrant yellow color<br />
of the wall making the new building come to life.<br />
Back in January 2011 when the financing<br />
for the project was announced, Headmaster Mr.<br />
Burke stated, “This new project will enable St.<br />
Sebastian’s School to continue in its ongoing effort<br />
and commitment to provide the highest quality<br />
educational experience to our students. <strong>The</strong><br />
expansion of our math, science and library<br />
facilities is an acknowledgement of the ever<br />
changing educational needs of our students at St.<br />
Sebastian’s.”<br />
<strong>The</strong> Math and Science building is now<br />
open for classes and the new section of the library<br />
remains quiet. <strong>The</strong> new building is an amazing<br />
masterpiece and a great place for new ideas and<br />
new learning.<br />
8