20.09.2015 Views

INSTALLATION INSTRUCTIONS

ACRD / ACSQ

ACRD / ACSQ

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>INSTALLATION</strong> <strong>INSTRUCTIONS</strong><br />

CATALOG NUMBER<br />

ACRD - ABL<br />

SUSPENDED FROM ARM (ABL)<br />

ARM ASSEMBLY<br />

STUDS<br />

INSPECTION COVER<br />

(2)S/S SET SCREWS<br />

INCOMING<br />

WIRE LEADS<br />

FIXTURE ASSEMBLY<br />

WIRE<br />

CONNECTIONS<br />

(BY OTHERS)<br />

FRONT OF FIXTURE<br />

LAMP COMPARTMENT<br />

4" O.D. POLE (REF)<br />

LAMP (BY OTHERS)<br />

S/S CAP SCREW<br />

FIXTURE <strong>INSTALLATION</strong> STEPS:<br />

1) TURN POWER OFF.<br />

2) PULL INCOMING WIRE LEADS THROUGH WIRE WAY AND SECURE<br />

ARM ASS'Y TO POLE WITH (2) 3/8-16 HEX BOLTS AND LOCK WASHERS.<br />

3) MAKE WIRE CONNECTIONS FROM INCOMING SUPPLY TO BALLAST.<br />

4) ALIGN STUDS WITH TOP OF BALLAST BRACKET AND PLACE ALL WIRING<br />

AND BALLAST INTO ARM ASSEMBLY.<br />

5) SECURE INSPECTION COVER WITH (2) S/S SET SCREWS.<br />

6) <strong>INSTALLATION</strong> COMPLETE.<br />

LAMP <strong>INSTALLATION</strong> STEPS:<br />

1) LOOSEN S/S CAP SCREW AND OPEN FIXTURE.<br />

2) INSTALL LAMP.<br />

3) CLOSE FIXTURE AND SECURE CAP SCREW.<br />

4) <strong>INSTALLATION</strong> COMPLETE.<br />

16555 East Gale Avenue<br />

City of Industry, CA 91745<br />

(626)968-5666<br />

DATE<br />

7/22/2010<br />

DATE<br />

APPRVD<br />

REV.<br />

PART NO.<br />

A96388

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!