The Monopod Bucket Foundation - GL Group
The Monopod Bucket Foundation - GL Group
The Monopod Bucket Foundation - GL Group
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
GENERATION - CHRLE<br />
Future prototypes<br />
Onshore test bucket, diameter 8m<br />
<strong>The</strong> primary purpose is to develop and test a lid<br />
excavation system and coupling device.<br />
Installation site: Onshore test facility in Frederikshavn<br />
Commencement date: fall 2009<br />
Full-scale prototype<br />
Offshore installation of a full-scale prototype, probably<br />
for a 3.6 MW wind turbine.<br />
Installation site: To be decided<br />
A location at Borkum Riffgrund is a possibility.<br />
Expected installation date:<br />
Late 2010 / Early 2011<br />
34