addition to expanding our overall IP portfolio, we have<br />

taken steps to strengthen our existing patents by filing<br />

continuations and derivatives of the patents with a focus<br />

on high value markets<br />

► In conclusion, we have assembled an excellent team<br />

of engineering and business professionals focused on<br />

achieving market penetration in the areas of perimeter<br />

security, oil and gas, and environmental monitoring. We<br />

expect to achieve substantial cash flow within the next<br />

12 months and provide long-term positive returns to our<br />

shareholders<br />

SKT, LLC:<br />

► S&K Technologies, LLC won an Individual Aircraft<br />

Tracking Program for the C-5. We will use base and flight<br />

history to predict corrosion damage potential<br />

► Our work was reviewed and summarized during the<br />

Aging Aircraft Office era for the Air Force Corrosion<br />

Prevention and Control office<br />

► The Israeli F-<strong>15</strong> Technical Order program was renewed<br />

on Sole Source basis<br />

► We have also setup and are operating a Print-On-Demand<br />

server for Israeli Air Force<br />

SKA, LLC:<br />

► S&K Aerospace awarded follow-on to Royal Saudi Air<br />

Force Third Party Logistics – November 2013<br />

► S&K Aerospace awarded option period for U.S. Air Force<br />

Medium Altitude Unmanned Aerial System support –<br />

December 2013<br />

► S&K Aerospace continues to provide Tri-Service support<br />

to over 90 FMS countries through PROS IV – March<br />

<strong>2014</strong><br />

SKLS, LLC:<br />

► SKLS inducted into 8a program Dec 2013<br />

SKER, LLC:<br />

► The Canyon Ferry Shoreline Stabilization was a $1<br />

Million dollar project completed for the Bureau of<br />

Reclamation in which we received very high ratings<br />

► Blackfoot Dam was an 8a contract for the Bureau of Land<br />

Management. The project consisted of dam removal and<br />

channel construction that again rated very high in job<br />

performance<br />

► Greely Creek stream reconstruction was a MDOT job<br />

where a new channel was constructed under an interstate<br />

bridge near Livingston, Montana<br />

► SKER reached major completion of two Army Corp<br />

jobs in North Dakota. They will be finished Spring <strong>2014</strong>.<br />

Garrison Dam and Fort Yates are part of SKER’s 8a<br />

MATOC<br />

► SKER started last fall and will complete this spring the<br />

Lower Dry Fork project for CSKT This is a $2.4 Million<br />

total dam and outlet structure rebuild<br />

SKGS, LLC:<br />

► Early 2013 saw the ramp up of operations in Houston<br />

and Oklahoma City with continuing work in Georgia,<br />

Washington, and Montana<br />

► SKGS added the EPA and US Forest Service as new<br />

customers and increased tasking with the FAA. Increased<br />

focus was placed on developing the tools and systems<br />

to allow the management team to meet customer<br />

requirements, continue to be competitive and ensure<br />

customer and employee satisfaction<br />

► SKGS entered in to an SBA approved Mentor Protégé<br />

agreement with SAIC which will afford SKGS significant<br />

growth and mentoring opportunities through <strong>2014</strong> and<br />

beyond.<br />