Falcon User’s Guide<br />

coming to VAFB via the airfield must clear customs at LAX or another port of entry prior to arrival at<br />

VAFB.<br />

As a standard service, SpaceX will arrange for the customer’s spacecraft container and all associated test<br />

and support equipment to be offloaded from the plane and transported to the payload processing facility.<br />

Ground transport services can also be provided by AstroTech or Spaceport System International; SpaceX<br />

can facilitate these as a nonstandard service.<br />

8.3 Spacecraft Processing<br />

SpaceX provides an ISO Class 8 (Class 100,000) PPF for processing customer spacecraft, including<br />

equipment unloading, unpacking/packing, final assembly, nonhazardous flight preparations, and payload<br />

checkout. The payload processing facility is available to customers from four weeks prior to launch, with<br />

16 hours per day standard availability and access during that period. Additional time in the payload<br />

processing facility may be available as a nonstandard service. The PPF layouts for VAFB and CCAFS are<br />

shown in Figure 8-2 and Figure 8-3, respectively.<br />

Services and equipment provided for satellite processing within the PPF are outlined in Table 8-1.<br />

Additional space is provided for customer ground support equipment and operations personnel. A facility<br />

HVAC system maintains payload processing facility environments. SpaceX will continuously monitor<br />

relative humidity, temperature and cleanliness in the payload processing facility using particle counters.<br />

Cleanliness monitoring using witness plates is available as a nonstandard service. After encapsulation and<br />

prior to launch vehicle mate, SpaceX will verify purge media source and ducting cleanliness. The<br />

customer must supply any necessary cables and converters for its ground support equipment to interface<br />

with payload processing facility power. SpaceX can supply alternative power sources as a nonstandard<br />

service.<br />

The PPF is also designed to accommodate hazardous operations such as hypergolic propellant loading and<br />

ordnance installation. Any required fueling operations will be performed by customer personnel with<br />

assistance from SpaceX personnel. All personnel must use certified SCAPE suits, pass a physical and<br />

attend SCAPE training classes.<br />

All spacecraft processing operations within the PPF must be completed by L-10 days to allow for mating<br />

to the payload adapter, fairing encapsulation and transportation to the launch vehicle integration hangar in<br />

preparation for launch.<br />

Revision 2 © 2015 Space Exploration Technologies Corp. All rights reserved. 54