Bayovar12 Reactive Phosphate Rock
hmgnka9
hmgnka9
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
FOCUS’ DRILLING & RESOURCE DISTRIBUTION<br />
• 62 holes drilled over<br />
8km by 3.6km (30% of<br />
total area of concession)<br />
• Indicated Resources<br />
defined on 800 x 800m<br />
drill spacing<br />
1.6km<br />
• Measured Resources on<br />
400 x 400 hole spacing<br />
• All holes cut the same<br />
sequence of phosphate<br />
beds<br />
<strong>Bayovar12</strong> <strong>Reactive</strong> <strong>Phosphate</strong> <strong>Rock</strong><br />
February 2016<br />
15