Feasibility Studies – M<strong>in</strong><strong>in</strong>g<br />
Key Outcomes from Pre-Feasibility<br />
Study (PFS)<br />
M<strong>in</strong><strong>in</strong>g Project PFS Reflects a Feasible Project<br />
with Attractive Returns<br />
• F<strong>in</strong>ancially feasible for all the options <strong>in</strong>vestigated.<br />
• Best-estimated NPV ranges between USD 211 million and<br />
USD 244 million.(at a discount rate of 5,5%), with 36% - 54%<br />
IRR range.<br />
•<br />
•<br />
•<br />
All – <strong>in</strong> cost marg<strong>in</strong> of between 33,6% and 53.9% (All–<strong>in</strong><br />
cost marg<strong>in</strong>s of above 25% are considered as healthy)<br />
Reasons:<br />
• Low operat<strong>in</strong>g costs as a result of the proposed m<strong>in</strong><strong>in</strong>g method<br />
and shalloworebody;<br />
• Small susta<strong>in</strong><strong>in</strong>g capital expenditure;<br />
• Fixed coal price as received frompower plant.<br />
• The high all-<strong>in</strong> cost marg<strong>in</strong> is <strong>in</strong>dicative of the robustness of the<br />
Project.<br />
Mechanised cont<strong>in</strong>uous surface m<strong>in</strong><strong>in</strong>g technology ensures<br />
low m<strong>in</strong><strong>in</strong>g cost and accurate m<strong>in</strong><strong>in</strong>g.<br />
A capital <strong>in</strong>vestment of between USD38 million and USD73<br />
million is required subject to m<strong>in</strong><strong>in</strong>g option selected<br />
Project payback period, between 2.6 and 3.65 years.<br />
The Project is most sensitive to coal price and operat<strong>in</strong>g cost.<br />
• Full (Def<strong>in</strong>itive) M<strong>in</strong><strong>in</strong>g Feasibility Study currently be<strong>in</strong>g executed<br />
by MINXCON scheduled for completion by the end of Q2 2016<br />
Mechanised Cont<strong>in</strong>uous Surface M<strong>in</strong>ers<br />
ensure coal delivered on specification to<br />
power station – no need for wash<strong>in</strong>g or<br />
crush<strong>in</strong>g<br />
March 2016 12