30.03.2016 Views

INEC-Programme

INEC-Programme

INEC-Programme

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Principal Sponsor<br />

13th International Naval Engineering Conference and Exhibition<br />

2016<br />

CONFERENCE PROGRAMME (subject to amendment)<br />

WEDNESDAY 27 APRIL 2016: PM PARALLEL SESSIONS<br />

1245 Discussion<br />

1300 Lunch<br />

Parallel Session H: ACTIVE | Parallel Session I: ADAPTIVE | Parallel Session J: AFFORDABLE |<br />

Hybrid Propulsion Integration Ship Support<br />

1400 Power and propulsion -<br />

meeting the concept<br />

J Fisher, T Couch, BMT Defence<br />

Services, UK<br />

1430 Advanced hybrid systems and<br />

new integration challenges<br />

O J Simmonds, GE Power<br />

Conversion, UK<br />

(Sir Donald Gosling Award Candidate)<br />

Total ship integration, why, and is it<br />

possible?<br />

T Drywood, C Jubb, T Dando, BMT<br />

Defence Services, UK<br />

Designing marine systems in<br />

complex warships - an exploration<br />

into the deployment of model<br />

based systems engineering<br />

W Tudor, C Bach, BAE Systems, UK<br />

(Sir Donald Gosling Award Candidates)<br />

What is the ideal maintenance<br />

strategy? A look at both MoD and<br />

commercial shipping best practice<br />

N A Tomlinson, BMT Defence Services, UK<br />

(Sir Donald Gosling Award Candidate)<br />

Operational maintenance and<br />

repair - An enterprise approach<br />

Cdr N Boyd RN, Royal Navy, UK<br />

1500 Hybrid propulsion: A design<br />

package for analysis and<br />

optimisation<br />

A Bhatt, Rolls-Royce, UK; Sub-Lt<br />

N A Arsenie RNLN, University<br />

College London, UK<br />

(Sir Donald Gosling Award Candidates)<br />

1530 Discussion<br />

1545 Tea<br />

1615 Development of a hybrid<br />

propulsion simulation model<br />

H-J Boonen, Damen Shipyards,<br />

the Netherlands<br />

(Sir Donald Gosling Award Candidate)<br />

1645 Faster RNLN's landing craft<br />

utilities in a new concept of<br />

operations<br />

M J Cordia, C J C M<br />

Posthumus, Defence Materiel<br />

Organisation, the Netherlands<br />

1715 Torque control for diesel<br />

mechanical and hybrid<br />

propulsion on naval vessels<br />

Lt Cdr R D Geertsma RNLN,<br />

Dr R R Negenborn, lr K Visser,<br />

Prof lr J J Hopman, Delft University<br />

of Technology, the Netherlands<br />

1745 Discussion<br />

Facing the challenges of integration<br />

and physical constraints when<br />

replacing major equipment in old<br />

platforms<br />

D Bainbridge, S McCance, Naval<br />

Design Partnering Team, UK<br />

Developments in shore based<br />

testing to meet latest marine<br />

power system integration<br />

challenges<br />

G Bellamy, B Salter, GE Power<br />

Conversion, UK<br />

Improving the design integrity<br />

of complex warships within an<br />

alliancing maritime enterprise<br />

D Ridgwell, T Drywood, I Langley,<br />

BMT Defence Services, UK<br />

De-risking strategy for Type 26 GCS<br />

power and propulsion system<br />

N McNaughtan, G McKinstry, R<br />

Wereski, BAE Systems, UK<br />

(Sir Donald Gosling Award Candidates)<br />

Warship innovative support<br />

planning<br />

I R Cowper, G Simpson, Babcock<br />

International Group, UK<br />

Deployable, reconfigurable,<br />

affordable and repurposable naval<br />

bases of the future<br />

Lim S H, EMAS Consultants LLP,<br />

Singapore; Prof Wang C M, National<br />

University of Singapore, Singapore;<br />

D J Peters, Royal HaskoningDHV, the<br />

Netherlands<br />

Navy's waste at commercial<br />

shipyard<br />

A S Ghowel, Arab Shipbuilding and Ship<br />

Repair Yard, Bahrain<br />

(Sir Donald Gosling Award Candidate)<br />

An introduction to the Babcock<br />

designed super dock blocks<br />

G Kerr, A Georgantzi, Babcock<br />

International Group, UK<br />

1815 Boats depart from Temple Meads Quay<br />

1900 Conference Reception: ss Great Britain (concluding at 2100 hours)<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!