11.07.2016 Views

Gas to Power in Botswana Investor Presentation Q3 2016

Q3-2016-Investor-Presentation-FINAL-05.07.16

Q3-2016-Investor-Presentation-FINAL-05.07.16

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

VISION & STRATEGY<br />

Long term vision <strong>to</strong> build a mid-tier energy provider <strong>in</strong> Southern Africa<br />

In June <strong>2016</strong>,<br />

<strong>Botswana</strong>’s<br />

Government<br />

announced that<br />

CBM is <strong>to</strong> be<br />

<strong>in</strong>cluded as part of<br />

the plan <strong>to</strong> deal<br />

with the country’s<br />

power deficiency<br />

Export<br />

power<br />

Greenfield<br />

IPP<br />

300MW<br />

Orapa<br />

90MW<br />

50MW <strong>Gas</strong>-<strong>to</strong>-<br />

<strong>Power</strong> project<br />

Initial scalable project,<br />

field expansion<br />

Certified reserves<br />

<strong>2016</strong><br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!