Gas to Power in Botswana Investor Presentation Q3 2016
Q3-2016-Investor-Presentation-FINAL-05.07.16
Q3-2016-Investor-Presentation-FINAL-05.07.16
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
VISION & STRATEGY<br />
Long term vision <strong>to</strong> build a mid-tier energy provider <strong>in</strong> Southern Africa<br />
In June <strong>2016</strong>,<br />
<strong>Botswana</strong>’s<br />
Government<br />
announced that<br />
CBM is <strong>to</strong> be<br />
<strong>in</strong>cluded as part of<br />
the plan <strong>to</strong> deal<br />
with the country’s<br />
power deficiency<br />
Export<br />
power<br />
Greenfield<br />
IPP<br />
300MW<br />
Orapa<br />
90MW<br />
50MW <strong>Gas</strong>-<strong>to</strong>-<br />
<strong>Power</strong> project<br />
Initial scalable project,<br />
field expansion<br />
Certified reserves<br />
<strong>2016</strong><br />
6