15.07.2016 Views

description-of-incoming-materials

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Concrete 3<br />

Site 1<br />

Concrete and asphalt that is larger than 3’ with wire and rebar, brick, adobe and asphalt with<br />

Petromat, clay tile ro<strong>of</strong>ing or other inert style <strong>of</strong> ro<strong>of</strong>ing. Load CANNOT exceed 50% dirt and/<br />

or base rock, lava rock or other rock <strong>materials</strong>. May contain trash, plastic piping or wood. All<br />

loads over 8 cubic yards are charged by the ton.<br />

25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!