The economic<br />

argument<br />

Amongst the many<br />

benefits the <strong>Porotherm</strong><br />

system brings, time<br />

and cost-savings are<br />

of major significance.<br />

Speed of laying<br />

A simple measure of productivity highlights the stark contrast between <strong>Porotherm</strong> and<br />

other methods – our precision clay blocks can be laid significantly faster.<br />

With no mortar required in the vertical joints, and with each block precision-ground for<br />

easy on-site use, <strong>Porotherm</strong> is designed for maximum build efficiency.<br />

Optimum stock<br />

The structural performance of the <strong>Porotherm</strong> system reduces the variance of block<br />

types and strengths required on-site. Furthermore, next day delivery from stockists<br />

reduces storage requirements on-site.<br />

Efficiency in the build programme<br />

Although the price per square metre of block-work is comparable to other masonry<br />

materials, the speed and efficiency that the <strong>Porotherm</strong> system offers on-site creates<br />

substantial savings in virtually every area, starting with a clear reduction in preliminary<br />

costs, and consolidated by reduced labour and mortar costs (due to the virtually dry<br />

nature of the system).<br />

- The benefits begin with the foundations – since our blocks are considerably<br />

lighter than concrete, foundation loads are lighter, which means structural, labour<br />

and machinery costs can be reduced.<br />

- The increased laying speed means achieving a water-tight shell significantly more<br />

quickly, allowing finishing trades to start work sooner.<br />

- With <strong>Porotherm</strong>, a project can be built to storey height without the normal need to<br />

back up, so the external skin can be taken off the critical path.<br />

The ultimate result is a walling system that is able to save both time and money<br />

throughout the build process, without compromising build quality or key sustainability criteria.<br />