contemporaneous reclamation would be employed so that 40 to 50 acres would be open at any<br />

given time. They will be mining dolomitic limestone to be used as raw material for concrete<br />

products, construction materials and agricultural liming material. The limestone will primarily be<br />

used for concrete products for the <strong>County</strong> Materials manufacturing facilities in Roberts and Eau<br />

Claire, WI. If a conditional use permit is granted, <strong>County</strong> Materials will remove their operation<br />

from the Schoeder quarry in Rock Elm. The proposed operation in located in the Town of Spring<br />

Lake. The property is zoned General Rural where nonmetallic mining is conditionally permitted.<br />

The site is currently woodland and agricultural use. Approximately 30 acres of woodland will<br />

remain undisturbed. The proposed access driveway is located near a vacant parcel with an<br />

abandoned house. Residences are located in close proximity to the proposed access on the<br />

opposite side of Hwy 128. <strong>County</strong> Materials will have no more than 9 trucks operating and these<br />

trucks will operate approximately 15 to 20 minutes apart during peak working times. The site is<br />

located in the Eau Galle River watershed. The nearest point of the quarry will be 1000’ from the<br />

river. Currently the site has runoff that directly reaches the River. <strong>County</strong> Materials is proposing<br />

to install a stormwater pond that will limit the amount of water that reaches the Eau Galle River<br />

from the site. The storm water pond will be constructed on the west side of the site. This pond<br />

would have certified engineer design and the capacity for a 100 year storm event. Stormwater<br />

berms will be installed in areas of possible overflows. Other 8 ft earthen berms will also be<br />

installed to protect the surrounding residences. Access to the mine is proposed off of State Hwy<br />

128. The applicant has contacted the DOT about an access but will not apply for one until they<br />

are granted the mining permit. Almost all of the truck traffic along Hwy 128 will be to the north<br />

as the trucks travel to and from the Roberts and Eau Claire facilities. The access will have a gate<br />

which will be locked when the site is not in operation. The quarry floor will be at 1045 ft, the<br />

water table elevation is approximately 945 ft. The rock is removed by drilling and blasting. It is<br />

processed and stockpiled on site, and hauled primarily to concrete products manufacturing plants<br />

in Roberts and Eau Claire. The drilling and blasting is performed by state licensed contractor.<br />

Typically 150,000 to 200,000 tons of material, dependant on market conditions, will be exported<br />

form the site annually, representing an average of 2 loads per hour. Dust will be controlled on-site<br />

by improving roadways with gravel and applying water on an as-needed basis. Activity on the<br />

site will typically occur during the construction season, March to November. However, some<br />

hauling of processed material may occur December through February, as conditions warrant.<br />

Hours of operation are proposed 6am to 9pm Monday through Friday, with occasional Saturday<br />

operations 8am to 5pm during the construction season. Typical hours will be 6am to 6pm<br />

Monday through Friday. The applicants are requesting to have hours until 9pm for the times<br />

when they are crushing. <strong>County</strong> Materials contracts their crushing, crushing will take place on the<br />

site for 2 to 4 weeks and then there will be no crushing activity for approximately one month.<br />

There will be no activity on the site on Sundays or holidays. They will employ up to six people.<br />

The Storm Water Pollution Prevention Plan and Spill Prevention Control and Countermeasures<br />

address the practices for fueling, lubrication and repair of the equipment. Fuel storage will be<br />

limited to one 500 or 1,000-gallon portable off-road diesel fuel tank for equipment compliant