04.10.2016 Views

The Emerson Cup Overview

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CATEGORIES & ELIGIBILITY CRITERIA<br />

Project And Product<br />

Nomination Pre-Requisites (Product )<br />

• Projects in commissioned/running condition for 1 to 5 years.<br />

• For project in retrofit category, age of the building should be 10+ years.<br />

• Project should be able to achieve thermal comfort (Using conventional or nonconventional system) [Not<br />

applicable for cold chain category]<br />

Nomination Pre-Requisites ( Project )<br />

• Product should be a complete refrigeration/air-conditioning unit including stand - alone units<br />

• Product should be designed / manufactured in India<br />

• NOC from company/departmental head should be attached with the entry<br />

• Product should have been introduced within the last 5 years. Product should be in operation at site for<br />

more than one year<br />

• Members of <strong>Emerson</strong> Climate Group, Jury Members/Jury organizations are not eligible for participation<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!