Annual Oyu Tolgoi Mine Visit
Combined-slide-pack-8-Nov-2016
Combined-slide-pack-8-Nov-2016
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Oyu</strong> <strong>Tolgoi</strong> underground a Tier 1 asset<br />
C/lb, 2016$<br />
400<br />
2025 copper mine C1+royalties+sustaining normal cost curve<br />
Q1 Q2 Q3 Q4<br />
300<br />
<strong>Oyu</strong> <strong>Tolgoi</strong><br />
Other <strong>Mine</strong>s<br />
200<br />
100<br />
0<br />
0<br />
2,000<br />
4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000<br />
kt<br />
Cumulative production (‘000 tonnes)<br />
-100<br />
Source: Wood Mackenzie (Q3’16 Cost Service). 2016 <strong>Oyu</strong> <strong>Tolgoi</strong> Technical Report. Turquoise Hill Resources.<br />
Normal C1 cost + sustaining capex, range capped at -100/lb & 400/lb for base, highly probable and probable mines only. <strong>Oyu</strong> <strong>Tolgoi</strong> costs and volumes for 2025-30.<br />
25