30.12.2016 Views

Overview of PAT Scheme Achievements and prospects

JT0U6P

JT0U6P

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PAT</strong>- Way forward (<strong>PAT</strong> Cycle II)<br />

• Deepening <strong>of</strong> <strong>PAT</strong> (existing sectors): Inclusion <strong>of</strong> more units from existing<br />

sectors<br />

– 89 DCs from (I&S, P&P, Cement, TPP, Chlor-Alkali, Fertilizer <strong>and</strong> Aluminum <strong>and</strong><br />

Textiles)<br />

• Widening <strong>of</strong> <strong>PAT</strong>: Inclusion <strong>of</strong> more units from new sectors<br />

– New sectors: Refinery, Railways <strong>and</strong> Electricity DISCOMS<br />

– 84 new DCs<br />

<strong>PAT</strong> Cycles No. <strong>of</strong> Units Share <strong>of</strong> total energy<br />

consumption (2009-10 Level)<br />

Sectors<br />

covered<br />

Cycle I (2012-13 to 2014-15) 478 DCs 36% 8<br />

Cycle II (2016-17 to 2018-19) 621 DCs 50% 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!