GOMBE STATE 2017 BUDGET
2017-Proposed-House
2017-Proposed-House
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>GOMBE</strong> <strong>STATE</strong> <strong>2017</strong> <strong>BUDGET</strong><br />
<strong>2017</strong> DETAILED CAPITAL EXPENDITURE<br />
<strong>2017</strong> Proposed Capital Expenditure<br />
Page 110 of 142<br />
Economic<br />
Code<br />
Project<br />
Code<br />
Project Description<br />
Approved 2016 Actual to October 2016<br />
Proposed <strong>2017</strong><br />
23020107<br />
05000214<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at Lafiya Wala Lunguda<br />
Primary School Balanga<br />
287,602.00<br />
0.00<br />
0.00<br />
23020107<br />
05000215<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at Walalunguda Primary<br />
School Balanga<br />
287,602.00<br />
0.00<br />
0.00<br />
23020107<br />
05000216<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at Tudu Primary School<br />
Balanga<br />
1,150,406.00<br />
0.00<br />
0.00<br />
23020107<br />
05000217<br />
Construction of 14 blocks of three Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at JSS Wuro Biriji Akko<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000218<br />
Construction of 14 blocks of three Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at JSS Kidda Akko<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000219<br />
Construction of 14 blocks of three Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at JSS Badara Akko<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000220<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at Tanfifi Primary School Akko<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000221<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at JSS Kore Balanga<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000222<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at JSS Dong Balanga<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000223<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at JSS Yalwan Dadiya Balanga<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000224<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at JSS Popandi Billiri<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000225<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at JSS Ayaba Billiri<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000226<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at Tal Primary School Billiri<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000227<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at JSS Kupto Funakaye<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000228<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at Jalingo Primary School<br />
Funakaye<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000229<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at JauroTudunWada Primary<br />
School Gombe<br />
454,220.00<br />
0.00<br />
0.00<br />
23020107<br />
05000230<br />
Construction of 10 blocks of two Classrooms<br />
each with terrazzo floor & 0.55mm Allum.long<br />
span roof cover at Tudun Wadan Pantami<br />
Primary School Gombe<br />
1,816,879.00<br />
0.00<br />
0.00<br />
23020107<br />
05000231<br />
Construction of 21 blocks of VIP Toilets each<br />
with 4 compartment 1 at Garin Garba Primary<br />
School Akko<br />
79,844.00<br />
0.00<br />
0.00<br />
23020107<br />
05000232<br />
Construction of 21 blocks of VIP Toilets each<br />
with 4 compartment 1 at Gulmari Primary<br />
School Akko<br />
79,844.00<br />
0.00<br />
0.00<br />
23020107<br />
05000233<br />
Construction of 21 blocks of VIP Toilets each<br />
with 4 compartment 1 at Badara Primary<br />
School Akko<br />
79,844.00<br />
0.00<br />
0.00<br />
23020107<br />
05000234<br />
Construction of 21 blocks of VIP Toilets each<br />
with 4 compartment 1 at Boltongoyal Primary<br />
School Akko<br />
79,844.00<br />
0.00<br />
0.00<br />
23020107<br />
05000235<br />
Construction of 21 blocks of VIP Toilets each<br />
with 4 compartment 1 at Late Primary School<br />
Akko<br />
79,844.00<br />
0.00<br />
0.00<br />
Page 110 of 142