C_TPLM30_66 Sample Practice
Pass your C_TPLM30_66 Certification Test easily in first try with our provided demo questions answers and full training kits prepared by the experts and professionals. For more info please visit here: http://www.testsexpert.com/C_TPLM30_66.html
Pass your C_TPLM30_66 Certification Test easily in first try with our provided demo questions answers and full training kits prepared by the experts and professionals. For more info please visit here: http://www.testsexpert.com/C_TPLM30_66.html
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Question: 11<br />
Which of the following control characters is available in the edit mask of the structure indicator?<br />
A. D (numeric characters)<br />
B. M (alphanumeric characters)<br />
C. Y (special characters)<br />
D. A (alpha characters)<br />
Question: 12<br />
Answer: D<br />
Which of the following is a benefit of SAP Solution Manager?<br />
A. It reduces the cost of implementation and continuous improvement.<br />
B. It enables central SAP NetWeaver Enterprise Search within all SAP systems.<br />
C. It provides common master data management within all SAP systems.<br />
D. It reduces the number of systems and operates only one central IT landscape.<br />
Question: 13<br />
Answer: A<br />
Which account assignment category can you specify in a settlement profile?<br />
A. Maintenance planning plant<br />
B. Functional location<br />
C. Equipment<br />
D. Material<br />
Question: 14<br />
Answer: D<br />
You have selected Confirmation Required in the control key for operations in a maintenance order.<br />
One of the operations is already partially confirmed.<br />
Which system statuses can the order header display before all operations are finally confirmed?<br />
(Choose three)<br />
A. TECO<br />
Visit us athttp://testsexpert.com/C_<strong>TPLM30</strong>_<strong>66</strong>.html