You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
How we did it...<br />
READER GARDEN<br />
4<br />
THE GARDEN<br />
room replaced a<br />
dilapidated shed. It took<br />
two days to install, and<br />
has been adopted by<br />
Neil as his official ‘man<br />
cave’, complete with<br />
dart board and bar!<br />
SPRING<br />
APRIL 2015 “This is how the garden looked when we moved in.<br />
Garden designer Christopher Rixton and his team cleared everything<br />
in less than a week. Experts took away the shed as it had asbestos<br />
roofing. The ground was excavated, a new drainage system was put in,<br />
and the foundations were built for the new garden room.”<br />
LATE SPRING<br />
MAY 2015 “All the brickwork was installed, including the raised beds<br />
and walls. The garden room went up in two days and then the fencing<br />
arrived. The sandstone patio areas were laid and the huge old olive<br />
tree was manoeuvred into place.”<br />
THE 90-YEAR-OLD olive tree took four men to lift into pride<br />
of place in the raised bed. It’s the undisputed star of the show.<br />
SUMMER<br />
JUNE 2015 “The fencing was erected, the artificial grass was<br />
installed, raised beds and planters were painted in white and grey, and<br />
the plants were put in place. Everything was completed by the end of<br />
the month, taking a total of 25 days from start to finish.”<br />
WORDS: FIONA CUMBERPATCH PHOTOS: WWW.GREENBIRDGARDENING.CO.UK<br />
➣<br />
APRIL 2017 MODERN GARDENS 15