04.04.2017 Views

FY 2018

DCOCFO_FY18_Budget_vol5_web

DCOCFO_FY18_Budget_vol5_web

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HIGHWAY TRUST FUND PROJECT BUDGET AUTHORITY and ALLOTMENT BALANCES<br />

(Projects with Budget Authority Balances Only)<br />

Report Run Date:Mar 28, 2017<br />

Agency<br />

Code/<br />

Title Project Title Project No<br />

LIfetime<br />

Budget<br />

Authority<br />

LTD<br />

Allotments<br />

LTD<br />

Expenditures<br />

Total<br />

Commitments**<br />

Budget<br />

Authority<br />

Balance<br />

Allotment<br />

Balance<br />

46 AM PRGM SUPPORT & ON-CALL SUBSURFACE INV OSS47A 77,924 77,924 13,680 0 64,243 64,243<br />

47 ANAC KNLW TRAILS (TIGER) 8888431 AW032A 18,518,950 18,518,950 16,278,562 538,503 1,701,885 1,701,885<br />

48 ANACOSTIA FREEWAY BRIDGES OVER NICHOLSON MRR51A 13,754,570 13,754,570 875 0 13,753,695 13,753,695<br />

49 ARA-3000(050)RESURF 17TH ST,NW MA-NH AV SR072A 5,781,326 5,781,326 5,781,011 0 315 315<br />

50 ARA8888(327) UNINTERUPTABLE POWER SUPPLY CI056A 4,546,604 4,546,604 3,195,568 137,972 1,213,065 1,213,065<br />

51 ARIZONA AVE TRAILS ZU055A 510,997 510,997 43,191 0 467,806 467,806<br />

52 ASSET INVENTORY PM0G5A 3,157,260 3,157,260 1,273,677 1,238,297 645,286 645,286<br />

53 ASSET INVENTORY AND ADA COMPLIANCE TRANS AF048A 3,753,225 3,753,225 3,052,753 12,126 688,346 688,346<br />

54 ASSET PRESERVATION OF TUNNELS IN THE DIS MNT20A 17,081,335 17,081,335 5,708 9,560,601 7,515,026 7,515,026<br />

55 ATLANTIC ST BR SE OV OXON RUN BH-4306(3) CDT96A 2,366,611 2,366,611 2,356,890 0 9,720 9,720<br />

56 AUDIT / COMPLIANCE PM0A9A 6,133,456 6,133,456 4,368,394 36,480 1,728,582 1,728,582<br />

57 AVM-2009(006)AMERICAN VETS MEMORIAL SR052A 9,736,848 9,736,848 8,626,381 49,714 1,060,753 1,060,753<br />

58 AWI-8888(286)PROGRAM MANAGEMENT-AWI CD044A 98,669,358 98,669,358 89,619,252 3,890,741 5,159,364 5,159,364<br />

59 BENNING RD BR OV KENILWORTH AVE CD052A 2,976,647 2,976,647 2,811,422 118,899 46,327 46,327<br />

60 BH-1103(23) 16 ST,NW BRIDGE OV MIL RD CDTC4A 16,725,253 16,725,253 14,980,346 0 1,744,907 1,744,907<br />

61 BH-1114(014)REHAB OF CONN AVE BR #27 CDTB8A 11,732,425 11,732,425 11,369,627 0 362,799 362,799<br />

62 BH-1121(10) NEW HAMPSHIRE AVE OV RAILRD CDTD4A 10,858,260 10,858,260 9,836,716 331,631 689,913 689,913<br />

63 BH-8888(061) 35TH ST,NE BR OV E CAPITOL CDTC2A 1,910,130 1,910,130 1,857,975 0 52,155 52,155<br />

64 BH-8888(244)<strong>FY</strong>07 BRIDGE DESIGN CONSULTAN CD032C 3,493,375 3,493,375 3,310,192 0 183,183 183,183<br />

65 BIKE CYCLE TRACKS ZU012A 886,281 886,281 672,085 254 213,943 213,943<br />

66 BIKE PARKING RACKS CM-8888(109) ZUT06A 780,356 780,356 779,391 0 966 966<br />

67 BIKE SHARING CM023A 26,170,993 26,170,993 25,256,006 17,371 897,616 897,616<br />

68 BIKE_CAPITAL BIKESHARE (CABI) ZU041A 1,637,306 1,637,306 1,253,210 30,000 354,096 354,096<br />

69 BLADENSBURG RD MT OLIVET-T ST STP-1200(7 CKT69A 8,353,897 8,354,638 7,868,845 265,043 220,009 220,750<br />

70 BLAIR/CEDAR/4TH ST NW MRR09A 479,776 479,776 318,203 94,491 67,082 67,082<br />

71 BOW DC AF058A 645,441 645,441 610,805 0 34,636 34,636<br />

72 BR #2 WISC AVE OVER C & O STP-3103(2) CDT20A 1,903,216 1,903,216 1,903,216 0 0 0<br />

73 BR #4 JEFFERSON ST OVER C & O STP-9999(4 CDT22A 11,133,619 11,133,619 9,834,589 0 1,299,031 1,299,031<br />

74 BR AND HIGHWAY DESIGN MANUAL STP-9999(85 PMT10A 2,117,737 2,117,737 1,976,302 50 141,385 141,385<br />

75 BR-3301(030)DES/BUIL 9 ST BRID NY AV AMT CDTE0A 56,764,569 56,764,569 56,578,710 0 185,858 185,858<br />

76 BRIDGE MANAGEMENT PROGRAM MRR43A 944,850 944,850 666,939 0 277,911 277,911<br />

77 BRIDGE MANAGEMENT SYSTEM CD053A 2,747,309 2,747,309 2,581,718 40,500 125,091 125,091<br />

78 BRIDGES CDTB3A 1,332,327 1,332,327 1,332,327 0 0 0<br />

79 CANAL RD, CHAIN BRIDGE TO M STREET MRR11A 1,353,664 1,353,664 1,288,072 8,878 56,714 56,714<br />

80 CANAL ROAD, NW ROCKSLOPE STABILIZATION PM0K6A 849,958 849,958 38,221 0 811,737 811,737<br />

81 CAPITAL BIKESHARE MARKETING AND OUTREACH ZU057A 482,938 482,938 212,880 177,401 92,657 92,657<br />

82 CAPITAL MOU DDOT LTCMOC 89,896 89,896 0 0 89,896 89,896<br />

83 CAPITOL HILL INFRASTRUCTURE IMPROVEMENTS MRR18A 13,138,204 13,138,204 551,996 10,193,860 2,392,348 2,392,348<br />

84 CAPTOP PHASE II CI060A 4,289,600 4,289,600 3,023,393 369,664 896,543 896,543<br />

85 CITYWIDE ENGINEERING SERVICES FOR STRUCT MNT05A 6,436,065 6,436,065 663,234 800,497 4,972,334 4,972,334<br />

86 CITYWIDE FEDERAL AID CONSULTANT BRIDGE I MNT13A 3,818,159 3,818,159 86,098 0 3,732,061 3,732,061<br />

87 CITYWIDE THERMOPLASTIC PAVEMENT MARKINGS CI034A 8,248,549 8,248,549 7,986,297 987 261,265 261,265<br />

88 MNT14A 2,994,300 2,994,300 2,789,610 140,308 64,383 64,383<br />

89 CIVIL RIGHTS COMPLIANCE <strong>FY</strong>17 PM0M3A 600,000 600,000 0 420,000 180,000 180,000<br />

90 CLEVELAND PARK STUDY PM0G8A 1,142,388 1,142,388 581,728 501,855 58,806 58,806<br />

91 CM 8888(218) SAFE ROUTES TO SCHOOL CM063A 4,430,201 4,430,201 4,430,201 0 0 0<br />

**Excludes Pre-encumbrances<br />

<strong>FY</strong> <strong>2018</strong> Proposed Budget and Financial Plan<br />

- Congressional Submission<br />

Capital Appendices<br />

H - 20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!