1. (TCO 12) _____ is the objective under JIT and time-based competition. (Points : 5)<br />

2. (TCO 2) Which of the following lead-time elements can be compressed into one welldesigned<br />

PAC system? (Points : 5)<br />

3. (TCO 3) What happens to inventory as the number of kanban cards increases? (Points : 5)<br />

4. (TCO 1) In managing supplier relations, which of the following is a beneficial setup? (Points :<br />

5)<br />

5. (TCO 6) When linking marketing requirements and manufacturing strategy, what design<br />

approaches for shop floor system should be considered? (Points : 5)<br />

6. (TCO 9) Which of the following is true? (Points : 5)<br />

7. (TCO 4) According to Elyahu Goldratt, the TOC system uses a scheduling approach called<br />

_____. (Points : 5)<br />

8. (TCO 5) The amount of time covered by the basic MRP record is called the _____. (Points :<br />

5)<br />

Page 2<br />

1. (TCO 1) Please explain PAC. (Points : 20)<br />

2. (TCO 2) How does input from other areas into PAC and the feedback PAC provides impact<br />

PAC? Explain. (Points : 20)<br />

3. (TCO 6) Discuss the differences between MRP and JIT. (Points : 20)<br />

<strong>BSOP</strong> <strong>429</strong> Week 4 Midterm <strong>–</strong> Set 2<br />

1. (TCO 12) Formal systems for shop floor control under JIT are _____.<br />

2. (TCO 2) An operation setback chart _____.<br />

3. (TCO 3) In order to minimize the number of orders waiting in the queue and maximize the<br />

number of orders processed in a center, which of the following rules should be used?