21.06.2017 Views

EDC PR 2016

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.16 MW<br />

Burgos Solar I<br />

2.66 MW<br />

Burgos Solar II<br />

120 MW<br />

Pantabangan<br />

12 MW<br />

Masiway<br />

150 MW<br />

Burgos Wind<br />

P<br />

P<br />

P<br />

CURRENT INSTALLED CAPACITY<br />

1,457.8 MW<br />

Today, <strong>EDC</strong> is a diversified renewable<br />

energy company, with steamfields and<br />

power plant projects located across the<br />

Philippine archipelago.<br />

ne MW can<br />

light up 20,000<br />

rural homes.<br />

120 MW<br />

BacMan I<br />

20 MW<br />

BacMan II<br />

112.5 MW<br />

Tongonan<br />

P<br />

P<br />

112.5 MW<br />

Palinpinon I<br />

60 MW<br />

Palinpinon II*<br />

* 20-MW Nasuji Power Plant<br />

placed on preservation<br />

49.4 MW<br />

Nasulo<br />

P<br />

P<br />

P P<br />

P<br />

P<br />

P<br />

125 MW<br />

Upper Mahiao<br />

232.5 MW<br />

Malitbog<br />

180 MW<br />

Mahanagdong<br />

50.9 MW<br />

Optimization<br />

P<br />

P<br />

LEGEND:<br />

P<br />

P<br />

Wind<br />

Solar<br />

Hydro<br />

Geothermal (<strong>EDC</strong> Subsidiary)<br />

P<br />

P<br />

P<br />

Geothermal (Integrated)<br />

Prospect Areas (Geothermal)<br />

Prospect Areas (Wind)<br />

Prospect Areas (Solar)<br />

52 MW<br />

Mindanao I<br />

54 MW<br />

Mindanao II<br />

SDG 2 102-2, 102-4, 102-49, EU1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!