02.02.2018 Views

Josephscragg_Portfolio

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AT WORK<br />

JOSEPH SCRAGG<br />

9 Cherry Laurel Walk, London, SW2 2DA<br />

t: 07718 241 154 e: jo.scragg@gmail.com


Collective Works British Pavilion, Venice Biennale


Greenpeace Concept sketch<br />

3D model<br />

Greenpeace Seasons<br />

Performance


Greenpeace Performance


Collective Works Elevation<br />

Street view


100<br />

t 0117 9733284<br />

f 0117 9732236<br />

e info@moondesignandbuild.co.uk<br />

w www.moondesignandbuild.co.uk<br />

project<br />

client<br />

job / drawing no.<br />

drawn checked pricing<br />

comment<br />

planning b regulations construction<br />

t 0117 9733284<br />

f 0117 9732236<br />

e info@moondesignandbuild.co.uk<br />

w www.moondesignandbuild.co.uk<br />

rev<br />

date<br />

scales<br />

T<br />

M<br />

D<br />

LED<br />

TV<br />

BT<br />

HDMI x1<br />

DAT6 X2<br />

drawing<br />

Switching<br />

Light switch - 1 gang 1 way<br />

Light switch - 1 gang 2 way<br />

Light switch - timer switch<br />

Light switch - last man out switch<br />

Light switch - 1 gang dimmer<br />

PIR sensor<br />

Light - Photosensor switch<br />

Lighting<br />

- Photosensor switch<br />

Light - Pendant<br />

Lighting<br />

5 Socket - 5 amp round pin<br />

GRID<br />

AM/CP<br />

AM/KP<br />

R<br />

Light - Pendant<br />

Light - Recessed downlighter<br />

Light - Recessed downlighter<br />

external / shower<br />

Light - Wall light<br />

Light - Wall light external<br />

Light - Flourescent tube<br />

Light - LED strip lighting under<br />

cabinet<br />

Light - Emergency fitting<br />

Note:<br />

Numbers relate to fitting type<br />

Power<br />

Socket - 1 gang switched<br />

Socket - 2 gang switched<br />

Socket - 1 gang unswitched<br />

Socket - 1 gang switched - above<br />

worktop height<br />

Socket - 2 gang switched - above<br />

worktop height<br />

Socket - 1 gang unswitched - high<br />

level TV<br />

Socket - 2 gang switched - high<br />

level TV<br />

Data/Comms<br />

TV/FM socket<br />

Telephone Socket<br />

Cable TV termination point<br />

HDMI socket<br />

Cat 6e/6 socket<br />

Cat 5e/6 socket<br />

Surround sound speaker<br />

Wall / ceiling mounted speaker<br />

iPod/Radio Dock<br />

General<br />

Set out point<br />

Consumer Unit<br />

Grid Switch<br />

Shaver Socket<br />

Heating Programmer<br />

Flush fitted wired room thermostat<br />

Extractor fan<br />

Alarm control panel<br />

Alarm keypad<br />

Smoke detector<br />

Heat Detector<br />

Mains doorbell<br />

Entry phone / intercom<br />

Radiator<br />

Outside tap<br />

CCTV Camera<br />

Existing electrics to remain<br />

NOTE - existing electrics to be<br />

removed are not shown on<br />

drawing<br />

HORIZONTAL<br />

SET OUT LINE<br />

MANSION HOUSE STABLES<br />

MANSION HOUSE STABLES<br />

haunched concrete to be<br />

take down and remove<br />

cut back to achieve sound<br />

existing walls, doors and roof<br />

and level substrate<br />

CONISTON COTTAGE<br />

04.01 DEMOLITION<br />

take down and remove<br />

existing blockwork skin<br />

NOTE: roof is asbestos, to be removed by<br />

appropriately qualified contractor<br />

extent of wall shown<br />

dotted has already been<br />

demolished<br />

existing bush to be<br />

removed<br />

remove steps<br />

existing blockwork to be<br />

retained<br />

ACO drain to connect<br />

to mains sewer<br />

existing magnolia tree to<br />

be retained<br />

Area of sloping slab within new<br />

garage to be smoothed over<br />

with concrete<br />

Concrete pad foundation 600mm wide,<br />

underside to be 600mm from external<br />

ground level or to satisfaction of<br />

building control officer<br />

2no. 100 x 100 x 4.0 SHS<br />

110mm stub stack<br />

pad footing to be<br />

formed 1550mm below<br />

ground level<br />

Area of existing slab to be broken out<br />

and re-laid level with garage floor<br />

Line of step in foundation<br />

Concrete strip foundation 600mm<br />

wide, underside to be 600mm from<br />

external ground level or to satisfaction<br />

of building control officer<br />

100mm blockwork cavity wall<br />

100mm blockwork pier.<br />

Blockwork laid flat.<br />

2no. 100 x 100 x 4.0 SHS<br />

626<br />

958<br />

Setting out line set between corners<br />

of neighbouring properties<br />

04.06<br />

5000<br />

4628 check dimension<br />

5050<br />

600<br />

362<br />

601<br />

04.03<br />

04.05 04.04<br />

2950<br />

74<br />

600<br />

3140<br />

293<br />

797<br />

5530 5784<br />

6024 check dimension<br />

100mm blockwork pier.<br />

Blockwork laid flat.<br />

CONISTON COTTAGE<br />

04.02 GROUNDWORKS<br />

ACO SET OUT<br />

FOUNDATION SET OUT<br />

BLOCKWORK SET OUT<br />

582<br />

4112<br />

2631 check dimension 1000<br />

1635<br />

2300<br />

1000 2650 check dimension<br />

2551<br />

6000<br />

324<br />

4166<br />

mains electric duct<br />

water duct<br />

spare duct<br />

line of level<br />

conrete slab<br />

2no. 100 x 100 x 4.0 SHS<br />

4113<br />

2no. 100 x 100 x 4.0 SHS<br />

358<br />

1000<br />

2576<br />

90.00°<br />

575 450<br />

1000<br />

2050<br />

Pad footing to be formed<br />

1550mm below ground level<br />

New rainwater gully<br />

4490<br />

New rainwater gully<br />

Drainage to run in garden and connect<br />

to mahole to side of 51 Canynge Road,<br />

pipe to be min 450mm below garden<br />

level<br />

New manhole<br />

Drainage to penetrate wall above<br />

ground level and then drop to below<br />

ground and connect to manhole<br />

New drainage runs cut<br />

into existing slab<br />

Line of new steps and<br />

access platform above<br />

60mm connection<br />

450mm wide strip foundation<br />

VERTICAL SET OUT LINE<br />

W1<br />

125 50 50 100 20<br />

23.01 WALL TYPE W1<br />

Rubble stone cavity<br />

125mm rubble stone facade<br />

clear cavity<br />

225mm long cavity wall ties @ 600mm<br />

horizontal and 450mm vertical centres<br />

to be fitted to run towards outer leaf<br />

50mm Celotex CW4000<br />

100mm medium density blockwork<br />

20mm plaster<br />

W2<br />

20 100 50 50 100<br />

23.02 WALL TYPE W2<br />

Rendered cavity<br />

225mm long cavity wall ties @ 600mm<br />

horizontal and 450mm vertical centres<br />

to be fitted to run towards outer leaf<br />

20mm sand and cement render<br />

applied in 2 coats, painted finish<br />

100mm medium density blockwork<br />

50mm clear cavity<br />

50mm Celotex CW4000<br />

100mm medium density blockwork<br />

20mm plaster<br />

W3<br />

2<br />

20<br />

23<br />

100mm medium density blockwork pier.<br />

Blockwork to be laid flat. SHS to be resin<br />

anchored to masonry at 450 centres with<br />

M12 Hilti HIT-HY resin anchors<br />

2 no. 100 x 100 x 4.0 SHS<br />

-0.720 TOP OF FOUNDATION<br />

20<br />

cavity tray<br />

100mm medium density<br />

blockwork<br />

100<br />

100mm medium<br />

density blockwork<br />

4 no. courses blue brindle bricks<br />

cavity tray<br />

100mm medium density<br />

blockwork<br />

125mm rubble stone<br />

100 65<br />

100 25<br />

Pavement level<br />

Pavement level<br />

conrete strip footing<br />

-1.340 BOTTOM OF FOUNDATION<br />

04.03 DETAIL<br />

1:10 @ A1<br />

slab relaid level with<br />

garage floor<br />

100mm blinded hardcore<br />

100mm medium density<br />

blockwork<br />

125 100 100 100 175<br />

-1.355 TOP OF FOUNDATION<br />

-1.750 BOTTOM OF FOUNDATION<br />

04.04 DETAIL<br />

1:10 @ A1<br />

weak mix mortar to cavity<br />

Scope of groundworks<br />

1 no. course 100mm<br />

medium density blockwork<br />

Concrete strip foundation<br />

600mm wide, underside to be<br />

600mm from external ground<br />

level or to satisfaction of building<br />

control officer<br />

slab relaid level with garage floor<br />

100mm blinded hardcore<br />

-1.245 TOP OF FOUNDATION 125 100 100 100 175<br />

-1.600 BOTTOM OF FOUNDATION<br />

04.05 DETAIL<br />

1:10 @ A1<br />

Scope of groundworks<br />

1 no. course 100mm<br />

medium density blockwork<br />

weak mix mortar to cavity<br />

Concrete strip foundation<br />

600mm wide, underside to be<br />

600mm from external ground<br />

level or to satisfaction of building<br />

control officer<br />

04.06 DETAIL<br />

1:10 @ A1<br />

ACO MultiDrain M100D<br />

No.10.0 with Slotted<br />

galvanised steel 400DL<br />

grating to garage threshold<br />

W5<br />

Celotex PL4065 insulation with<br />

plasterboard face<br />

100mm medium density blockwork<br />

W6<br />

12mm plywood to garage face<br />

100mm Celotex GA4000<br />

VCL<br />

12.5mm plasterboard with skim finish<br />

W7<br />

- 08.07.15 Issued for construction<br />

P2<br />

P1<br />

29.04.15<br />

15.04.15<br />

Issued for pricing<br />

Issued to Party Wall Surveyor<br />

125 x 50mm studwork<br />

GENERAL NOTES<br />

All dimensions are to be checked on site prior to commencement of This is not an `As built drawing’. Moon takes no responsibility for<br />

works and/or preparation of any shop drawings.<br />

other parties relying on this information.<br />

Sizes of and dimensions to any structural elements are indicative only. Please note that drawing details are subject to change as a result of<br />

See structural engineers drawings for actual sizes/dimensions. site-specific issues.<br />

Sizes of and dimensions to any service elements are indicative only. Information contained on this drawing is the sole copyright of Moon<br />

See service engineer’s drawings for actual sizes/dimensions.<br />

Design & Build and is not to be reproduced without their permission.<br />

This drawing GENERAL is to be NOTES read in conjunction with all other drawings,<br />

specifications All dimensions and other are Consultants' to be checked information. on site prior to commencement DO NOT of SCALE This FROM is not THIS an `As DRAWING. built drawing’. Moon takes no responsibility for<br />

works and/or preparation of any shop drawings.<br />

other parties relying on this information.<br />

Sizes of and dimensions to any structural elements are indicative only. Please note that drawing details are subject to change as a result of<br />

See structural engineers drawings for actual sizes/dimensions.<br />

site-specific issues.<br />

Sizes of and dimensions to any service elements are indicative only. Information contained on this drawing is the sole copyright of Moon<br />

See service engineer’s drawings for actual sizes/dimensions.<br />

Design & Build and is not to be reproduced without their permission.<br />

This drawing is to be read in conjunction with all other drawings,<br />

specifications and other Consultants' information.<br />

DO NOT SCALE FROM THIS DRAWING.<br />

DATUM LEVEL 0.00 = 1M ABOVE EXISTING SLAB<br />

21.01<br />

15.01<br />

HORIZONTAL<br />

SET OUT LINE<br />

21.02<br />

The Coach House<br />

18 Sutherland Place<br />

Clifton<br />

Bristol BS8 2TZ<br />

JS<br />

New Garage/Ancillary Building,<br />

Land to rear of 51 Canynge Rd,<br />

Litfield Road, Clifton BS8 3LH<br />

Emma Webster & Jonathan<br />

Laredo<br />

PH AB TN<br />

June 2015<br />

1:50 / 1:10<br />

@ A1<br />

Demolition / Groundworks<br />

LRG.04/-<br />

23.05 WALL TYPE W5<br />

Plasterboard thermal laminate<br />

23.06 WALL TYPE W6<br />

Internal studwork<br />

23<br />

Blockwork to be set 20mm back from face<br />

of adjoining building to allow for render<br />

finish<br />

SET OUT<br />

POINT<br />

MANSION HOUSE STABLES<br />

24.05<br />

300L x 215dp C20 concrete padstone<br />

underground ducting laid for new electrical<br />

connection<br />

16.01<br />

3165<br />

24.01<br />

W2<br />

3788<br />

300<br />

R<br />

1817 check dimension<br />

100<br />

1652 check dimension<br />

SEE LRG.80<br />

FOR LAYOUT<br />

shower room<br />

DG.05<br />

834 756<br />

SD<br />

70 3652 100<br />

DG.06<br />

835<br />

W7<br />

bedroom<br />

2no. 100 x 100 x 4.0 SHS<br />

3260 CHECK DIM<br />

R<br />

DG.04<br />

100<br />

62 38<br />

1959 CHECK DIM<br />

W2<br />

1000<br />

24.06<br />

Catnic lintel over<br />

16.01<br />

ELECTRICAL + HEATING KEY<br />

2<br />

3 Light switch - 1 gang 3 way<br />

25<br />

65<br />

100<br />

F1<br />

25mm floor finish TBC by client<br />

65mm screed<br />

VCL<br />

100mm Celotex GA4000<br />

DPM<br />

Existing slab<br />

F2<br />

Painted concrete finish<br />

Concrete build up<br />

Existing slab<br />

22<br />

80<br />

145<br />

18.01<br />

2no. 305 x 165 x 54 UKB (GALVANISED)<br />

DIAPHRAGMED<br />

2095<br />

1 2 3 4 5 6 7<br />

125<br />

897<br />

222<br />

562<br />

4916 CHECK DIM<br />

2no. 203 x 133 x 25 UKB<br />

W5<br />

DG.08<br />

1778 CHECK DIM<br />

3363<br />

793 850 698<br />

SET OUT<br />

2no. 100 x 100 x 4.0 SHS<br />

POINT<br />

VERTICAL SET OUT<br />

LINE<br />

5142 CHECK DIM<br />

100 2241 100 100 38<br />

17.01 62<br />

17.01<br />

LITFIELD ROAD<br />

5530 CRITICAL DIMENSION<br />

Catnic lintel over<br />

300L x 215dp C20 concrete padstone<br />

DG.02<br />

24.03<br />

5530<br />

440<br />

175<br />

W1<br />

1525<br />

24.02<br />

482<br />

72<br />

1525<br />

DG.01<br />

entry<br />

DG.07<br />

SEE LRG.70 FOR<br />

STAIR DETAILS<br />

W6<br />

garage<br />

PM<br />

DG.07 to be FD30s self closing fire door<br />

fitted with Perko door closer<br />

HD<br />

2no. 305 x 165 x 40 UKB<br />

DIAPHRAGMED<br />

DB<br />

253<br />

2170<br />

2460<br />

290<br />

2953 CHECK DIM<br />

TV<br />

BT<br />

R<br />

2no. 100 x 100 x 4.0 SHS<br />

15.02 15.03<br />

W5<br />

store<br />

100<br />

2170<br />

100<br />

371<br />

DG.03<br />

262<br />

90.00°<br />

W3<br />

1455<br />

845<br />

741<br />

W2<br />

5550 CHECK DIM<br />

24.07<br />

24.08<br />

24.09<br />

3300<br />

300L x 215dp C20 concrete padstone<br />

18.01<br />

300L x 215dp C20 concrete padstone<br />

ELECTRICAL + HEATING KEY<br />

E<br />

CTV<br />

iPod<br />

HP<br />

RT<br />

SD<br />

HD<br />

23.09 FLOOR TYPE F1<br />

GF living accomodation<br />

R1<br />

Slate roof finish<br />

25x38mm tanalised sw battens at<br />

centres to suit slate roofing<br />

Breather membrane, all laps and<br />

penetrations to be sealed<br />

150x50mm C24 rafters @ 600mm c/c<br />

in accordance with structural<br />

engineer's specification<br />

100mm Celotex FR5000 insulation<br />

fitted tightly between rafters<br />

Expert Multi Foil stapled to underside<br />

of rafters to be taped at joints to act as<br />

vapour barrier<br />

25x38mm sw battens to underside of<br />

insulation<br />

12.5mm Gyproc Wallboard taped and<br />

skimmed<br />

120 18 150<br />

23.10 FLOOR TYPE F2<br />

GF garage<br />

R2<br />

Dryseal GRP roofing<br />

120mm Kingspan Thermaroof TR26<br />

insulation mechanically fixed back to<br />

roof deck<br />

VCL<br />

18mm OSB decking<br />

50 x 150mm tanalised sw joists<br />

@400mm c/c<br />

12.5mm plasterboard with skim finish<br />

OR<br />

12mm plywood to garage<br />

23<br />

19.01 19.01<br />

W1<br />

2no. 100 x 100 x 4.0 SHS<br />

24.04<br />

587CHECK DIM<br />

raise wall in medium density<br />

blockwork<br />

23.12 ROOF TYPE R1<br />

1F living accomodation<br />

23.13 ROOF TYPE R2<br />

GF living accomodation<br />

GENERAL NOTES<br />

All dimensions are to be checked on site prior to commencement of<br />

works and/or preparation of any shop drawings.<br />

Sizes of and dimensions to any structural elements are indicative only.<br />

See structural engineers drawings for actual sizes/dimensions.<br />

Sizes of and dimensions to any service elements are indicative only.<br />

See service engineer’s drawings for actual sizes/dimensions.<br />

This drawing is to be read in conjunction with all other drawings,<br />

specifications and other Consultants' information.<br />

This is not an `As built drawing’. Moon takes no responsibility for<br />

other parties relying on this information.<br />

Please note that drawing details are subject to change as a result of<br />

site-specific issues.<br />

Information contained on this drawing is the sole copyright of Moon<br />

Design & Build and is not to be reproduced without their permission.<br />

scale<br />

DO NOT SCALE FROM THIS DRAWING.<br />

0m 1 2 3 @ 1:25<br />

15.01<br />

CONISTON COTTAGE<br />

21.03 21.03<br />

21.01<br />

15.02 15.03<br />

24.10<br />

21.02<br />

The Coach House<br />

project<br />

18 Sutherland Place New Garage/Ancillary Building,<br />

Clifton<br />

Land to rear of 51 Canynge Rd,<br />

Bristol BS8 2TZ<br />

Litfield Road, Clifton BS8 3LH<br />

client<br />

Emma Webster & Jonathan<br />

Laredo<br />

drawn JS checked PH AB TN<br />

pricing<br />

comment<br />

planning b regulations construction<br />

rev<br />

- 14.08.15 ISSUED FOR CONSTRUCTION<br />

P7 30.07.15 Issued to building control<br />

P6 29.07.15 Issued to SE<br />

P5 08.07.15 Issued to SDS<br />

P4 01.07.15 Issued to Western Power Distribution<br />

P3 10.06.15 Issued for pricing<br />

P2 29.04.15 Issued for pricing<br />

P1 15.04.15 Issued to Party Wall Surveyor<br />

GENERAL NOTES<br />

date<br />

drawing<br />

All dimensions are to be checked on site prior to commencement of<br />

June 2015 GA GF PLAN<br />

works and/or preparation of any shop drawings.<br />

Sizes of and dimensions to any structural elements are indicative only.<br />

scales<br />

job / drawing no.<br />

1:25 @ A1 See structural engineers drawings for actual sizes/dimensions.<br />

LRG.10/-<br />

Sizes of and dimensions to any service elements are indicative only.<br />

See service engineer’s drawings for actual sizes/dimensions.<br />

This drawing is to be read in conjunction with all other drawings,<br />

specifications and other Consultants' information.<br />

This is not an `As built drawing’. Moon takes no responsibility for<br />

other parties relying on this information.<br />

Please note that drawing details are subject to change as a result of<br />

site-specific issues.<br />

Information contained on this drawing is the sole copyright of Moon<br />

Design & Build and is not to be reproduced without their permission.<br />

DO NOT SCALE FROM THIS DRAWING.<br />

scale<br />

100 200 300 400<br />

0mm 500mm @ 1:5


White Design<br />

LILAC, Leeds<br />

Community


Rene Van Zuuk<br />

Canal view<br />

Viewpoint<br />

Rene Van Zuuk Visitors centre<br />

Model


Studies<br />

Concept sketch<br />

Aerial<br />

Collective Works Installation<br />

Soft play


Collective Works Reading time<br />

Multi-use<br />

Studies Physical model<br />

Domestic scale


Collective Works Approach<br />

Lake side


9 Cherry Laurel Walk, London, SW2 2DA<br />

t: 07718 241 154 e: jo.scragg@gmail.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!