Josephscragg_Portfolio
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
AT WORK<br />
JOSEPH SCRAGG<br />
9 Cherry Laurel Walk, London, SW2 2DA<br />
t: 07718 241 154 e: jo.scragg@gmail.com
Collective Works British Pavilion, Venice Biennale
Greenpeace Concept sketch<br />
3D model<br />
Greenpeace Seasons<br />
Performance
Greenpeace Performance
Collective Works Elevation<br />
Street view
100<br />
t 0117 9733284<br />
f 0117 9732236<br />
e info@moondesignandbuild.co.uk<br />
w www.moondesignandbuild.co.uk<br />
project<br />
client<br />
job / drawing no.<br />
drawn checked pricing<br />
comment<br />
planning b regulations construction<br />
t 0117 9733284<br />
f 0117 9732236<br />
e info@moondesignandbuild.co.uk<br />
w www.moondesignandbuild.co.uk<br />
rev<br />
date<br />
scales<br />
T<br />
M<br />
D<br />
LED<br />
TV<br />
BT<br />
HDMI x1<br />
DAT6 X2<br />
drawing<br />
Switching<br />
Light switch - 1 gang 1 way<br />
Light switch - 1 gang 2 way<br />
Light switch - timer switch<br />
Light switch - last man out switch<br />
Light switch - 1 gang dimmer<br />
PIR sensor<br />
Light - Photosensor switch<br />
Lighting<br />
- Photosensor switch<br />
Light - Pendant<br />
Lighting<br />
5 Socket - 5 amp round pin<br />
GRID<br />
AM/CP<br />
AM/KP<br />
R<br />
Light - Pendant<br />
Light - Recessed downlighter<br />
Light - Recessed downlighter<br />
external / shower<br />
Light - Wall light<br />
Light - Wall light external<br />
Light - Flourescent tube<br />
Light - LED strip lighting under<br />
cabinet<br />
Light - Emergency fitting<br />
Note:<br />
Numbers relate to fitting type<br />
Power<br />
Socket - 1 gang switched<br />
Socket - 2 gang switched<br />
Socket - 1 gang unswitched<br />
Socket - 1 gang switched - above<br />
worktop height<br />
Socket - 2 gang switched - above<br />
worktop height<br />
Socket - 1 gang unswitched - high<br />
level TV<br />
Socket - 2 gang switched - high<br />
level TV<br />
Data/Comms<br />
TV/FM socket<br />
Telephone Socket<br />
Cable TV termination point<br />
HDMI socket<br />
Cat 6e/6 socket<br />
Cat 5e/6 socket<br />
Surround sound speaker<br />
Wall / ceiling mounted speaker<br />
iPod/Radio Dock<br />
General<br />
Set out point<br />
Consumer Unit<br />
Grid Switch<br />
Shaver Socket<br />
Heating Programmer<br />
Flush fitted wired room thermostat<br />
Extractor fan<br />
Alarm control panel<br />
Alarm keypad<br />
Smoke detector<br />
Heat Detector<br />
Mains doorbell<br />
Entry phone / intercom<br />
Radiator<br />
Outside tap<br />
CCTV Camera<br />
Existing electrics to remain<br />
NOTE - existing electrics to be<br />
removed are not shown on<br />
drawing<br />
HORIZONTAL<br />
SET OUT LINE<br />
MANSION HOUSE STABLES<br />
MANSION HOUSE STABLES<br />
haunched concrete to be<br />
take down and remove<br />
cut back to achieve sound<br />
existing walls, doors and roof<br />
and level substrate<br />
CONISTON COTTAGE<br />
04.01 DEMOLITION<br />
take down and remove<br />
existing blockwork skin<br />
NOTE: roof is asbestos, to be removed by<br />
appropriately qualified contractor<br />
extent of wall shown<br />
dotted has already been<br />
demolished<br />
existing bush to be<br />
removed<br />
remove steps<br />
existing blockwork to be<br />
retained<br />
ACO drain to connect<br />
to mains sewer<br />
existing magnolia tree to<br />
be retained<br />
Area of sloping slab within new<br />
garage to be smoothed over<br />
with concrete<br />
Concrete pad foundation 600mm wide,<br />
underside to be 600mm from external<br />
ground level or to satisfaction of<br />
building control officer<br />
2no. 100 x 100 x 4.0 SHS<br />
110mm stub stack<br />
pad footing to be<br />
formed 1550mm below<br />
ground level<br />
Area of existing slab to be broken out<br />
and re-laid level with garage floor<br />
Line of step in foundation<br />
Concrete strip foundation 600mm<br />
wide, underside to be 600mm from<br />
external ground level or to satisfaction<br />
of building control officer<br />
100mm blockwork cavity wall<br />
100mm blockwork pier.<br />
Blockwork laid flat.<br />
2no. 100 x 100 x 4.0 SHS<br />
626<br />
958<br />
Setting out line set between corners<br />
of neighbouring properties<br />
04.06<br />
5000<br />
4628 check dimension<br />
5050<br />
600<br />
362<br />
601<br />
04.03<br />
04.05 04.04<br />
2950<br />
74<br />
600<br />
3140<br />
293<br />
797<br />
5530 5784<br />
6024 check dimension<br />
100mm blockwork pier.<br />
Blockwork laid flat.<br />
CONISTON COTTAGE<br />
04.02 GROUNDWORKS<br />
ACO SET OUT<br />
FOUNDATION SET OUT<br />
BLOCKWORK SET OUT<br />
582<br />
4112<br />
2631 check dimension 1000<br />
1635<br />
2300<br />
1000 2650 check dimension<br />
2551<br />
6000<br />
324<br />
4166<br />
mains electric duct<br />
water duct<br />
spare duct<br />
line of level<br />
conrete slab<br />
2no. 100 x 100 x 4.0 SHS<br />
4113<br />
2no. 100 x 100 x 4.0 SHS<br />
358<br />
1000<br />
2576<br />
90.00°<br />
575 450<br />
1000<br />
2050<br />
Pad footing to be formed<br />
1550mm below ground level<br />
New rainwater gully<br />
4490<br />
New rainwater gully<br />
Drainage to run in garden and connect<br />
to mahole to side of 51 Canynge Road,<br />
pipe to be min 450mm below garden<br />
level<br />
New manhole<br />
Drainage to penetrate wall above<br />
ground level and then drop to below<br />
ground and connect to manhole<br />
New drainage runs cut<br />
into existing slab<br />
Line of new steps and<br />
access platform above<br />
60mm connection<br />
450mm wide strip foundation<br />
VERTICAL SET OUT LINE<br />
W1<br />
125 50 50 100 20<br />
23.01 WALL TYPE W1<br />
Rubble stone cavity<br />
125mm rubble stone facade<br />
clear cavity<br />
225mm long cavity wall ties @ 600mm<br />
horizontal and 450mm vertical centres<br />
to be fitted to run towards outer leaf<br />
50mm Celotex CW4000<br />
100mm medium density blockwork<br />
20mm plaster<br />
W2<br />
20 100 50 50 100<br />
23.02 WALL TYPE W2<br />
Rendered cavity<br />
225mm long cavity wall ties @ 600mm<br />
horizontal and 450mm vertical centres<br />
to be fitted to run towards outer leaf<br />
20mm sand and cement render<br />
applied in 2 coats, painted finish<br />
100mm medium density blockwork<br />
50mm clear cavity<br />
50mm Celotex CW4000<br />
100mm medium density blockwork<br />
20mm plaster<br />
W3<br />
2<br />
20<br />
23<br />
100mm medium density blockwork pier.<br />
Blockwork to be laid flat. SHS to be resin<br />
anchored to masonry at 450 centres with<br />
M12 Hilti HIT-HY resin anchors<br />
2 no. 100 x 100 x 4.0 SHS<br />
-0.720 TOP OF FOUNDATION<br />
20<br />
cavity tray<br />
100mm medium density<br />
blockwork<br />
100<br />
100mm medium<br />
density blockwork<br />
4 no. courses blue brindle bricks<br />
cavity tray<br />
100mm medium density<br />
blockwork<br />
125mm rubble stone<br />
100 65<br />
100 25<br />
Pavement level<br />
Pavement level<br />
conrete strip footing<br />
-1.340 BOTTOM OF FOUNDATION<br />
04.03 DETAIL<br />
1:10 @ A1<br />
slab relaid level with<br />
garage floor<br />
100mm blinded hardcore<br />
100mm medium density<br />
blockwork<br />
125 100 100 100 175<br />
-1.355 TOP OF FOUNDATION<br />
-1.750 BOTTOM OF FOUNDATION<br />
04.04 DETAIL<br />
1:10 @ A1<br />
weak mix mortar to cavity<br />
Scope of groundworks<br />
1 no. course 100mm<br />
medium density blockwork<br />
Concrete strip foundation<br />
600mm wide, underside to be<br />
600mm from external ground<br />
level or to satisfaction of building<br />
control officer<br />
slab relaid level with garage floor<br />
100mm blinded hardcore<br />
-1.245 TOP OF FOUNDATION 125 100 100 100 175<br />
-1.600 BOTTOM OF FOUNDATION<br />
04.05 DETAIL<br />
1:10 @ A1<br />
Scope of groundworks<br />
1 no. course 100mm<br />
medium density blockwork<br />
weak mix mortar to cavity<br />
Concrete strip foundation<br />
600mm wide, underside to be<br />
600mm from external ground<br />
level or to satisfaction of building<br />
control officer<br />
04.06 DETAIL<br />
1:10 @ A1<br />
ACO MultiDrain M100D<br />
No.10.0 with Slotted<br />
galvanised steel 400DL<br />
grating to garage threshold<br />
W5<br />
Celotex PL4065 insulation with<br />
plasterboard face<br />
100mm medium density blockwork<br />
W6<br />
12mm plywood to garage face<br />
100mm Celotex GA4000<br />
VCL<br />
12.5mm plasterboard with skim finish<br />
W7<br />
- 08.07.15 Issued for construction<br />
P2<br />
P1<br />
29.04.15<br />
15.04.15<br />
Issued for pricing<br />
Issued to Party Wall Surveyor<br />
125 x 50mm studwork<br />
GENERAL NOTES<br />
All dimensions are to be checked on site prior to commencement of This is not an `As built drawing’. Moon takes no responsibility for<br />
works and/or preparation of any shop drawings.<br />
other parties relying on this information.<br />
Sizes of and dimensions to any structural elements are indicative only. Please note that drawing details are subject to change as a result of<br />
See structural engineers drawings for actual sizes/dimensions. site-specific issues.<br />
Sizes of and dimensions to any service elements are indicative only. Information contained on this drawing is the sole copyright of Moon<br />
See service engineer’s drawings for actual sizes/dimensions.<br />
Design & Build and is not to be reproduced without their permission.<br />
This drawing GENERAL is to be NOTES read in conjunction with all other drawings,<br />
specifications All dimensions and other are Consultants' to be checked information. on site prior to commencement DO NOT of SCALE This FROM is not THIS an `As DRAWING. built drawing’. Moon takes no responsibility for<br />
works and/or preparation of any shop drawings.<br />
other parties relying on this information.<br />
Sizes of and dimensions to any structural elements are indicative only. Please note that drawing details are subject to change as a result of<br />
See structural engineers drawings for actual sizes/dimensions.<br />
site-specific issues.<br />
Sizes of and dimensions to any service elements are indicative only. Information contained on this drawing is the sole copyright of Moon<br />
See service engineer’s drawings for actual sizes/dimensions.<br />
Design & Build and is not to be reproduced without their permission.<br />
This drawing is to be read in conjunction with all other drawings,<br />
specifications and other Consultants' information.<br />
DO NOT SCALE FROM THIS DRAWING.<br />
DATUM LEVEL 0.00 = 1M ABOVE EXISTING SLAB<br />
21.01<br />
15.01<br />
HORIZONTAL<br />
SET OUT LINE<br />
21.02<br />
The Coach House<br />
18 Sutherland Place<br />
Clifton<br />
Bristol BS8 2TZ<br />
JS<br />
New Garage/Ancillary Building,<br />
Land to rear of 51 Canynge Rd,<br />
Litfield Road, Clifton BS8 3LH<br />
Emma Webster & Jonathan<br />
Laredo<br />
PH AB TN<br />
June 2015<br />
1:50 / 1:10<br />
@ A1<br />
Demolition / Groundworks<br />
LRG.04/-<br />
23.05 WALL TYPE W5<br />
Plasterboard thermal laminate<br />
23.06 WALL TYPE W6<br />
Internal studwork<br />
23<br />
Blockwork to be set 20mm back from face<br />
of adjoining building to allow for render<br />
finish<br />
SET OUT<br />
POINT<br />
MANSION HOUSE STABLES<br />
24.05<br />
300L x 215dp C20 concrete padstone<br />
underground ducting laid for new electrical<br />
connection<br />
16.01<br />
3165<br />
24.01<br />
W2<br />
3788<br />
300<br />
R<br />
1817 check dimension<br />
100<br />
1652 check dimension<br />
SEE LRG.80<br />
FOR LAYOUT<br />
shower room<br />
DG.05<br />
834 756<br />
SD<br />
70 3652 100<br />
DG.06<br />
835<br />
W7<br />
bedroom<br />
2no. 100 x 100 x 4.0 SHS<br />
3260 CHECK DIM<br />
R<br />
DG.04<br />
100<br />
62 38<br />
1959 CHECK DIM<br />
W2<br />
1000<br />
24.06<br />
Catnic lintel over<br />
16.01<br />
ELECTRICAL + HEATING KEY<br />
2<br />
3 Light switch - 1 gang 3 way<br />
25<br />
65<br />
100<br />
F1<br />
25mm floor finish TBC by client<br />
65mm screed<br />
VCL<br />
100mm Celotex GA4000<br />
DPM<br />
Existing slab<br />
F2<br />
Painted concrete finish<br />
Concrete build up<br />
Existing slab<br />
22<br />
80<br />
145<br />
18.01<br />
2no. 305 x 165 x 54 UKB (GALVANISED)<br />
DIAPHRAGMED<br />
2095<br />
1 2 3 4 5 6 7<br />
125<br />
897<br />
222<br />
562<br />
4916 CHECK DIM<br />
2no. 203 x 133 x 25 UKB<br />
W5<br />
DG.08<br />
1778 CHECK DIM<br />
3363<br />
793 850 698<br />
SET OUT<br />
2no. 100 x 100 x 4.0 SHS<br />
POINT<br />
VERTICAL SET OUT<br />
LINE<br />
5142 CHECK DIM<br />
100 2241 100 100 38<br />
17.01 62<br />
17.01<br />
LITFIELD ROAD<br />
5530 CRITICAL DIMENSION<br />
Catnic lintel over<br />
300L x 215dp C20 concrete padstone<br />
DG.02<br />
24.03<br />
5530<br />
440<br />
175<br />
W1<br />
1525<br />
24.02<br />
482<br />
72<br />
1525<br />
DG.01<br />
entry<br />
DG.07<br />
SEE LRG.70 FOR<br />
STAIR DETAILS<br />
W6<br />
garage<br />
PM<br />
DG.07 to be FD30s self closing fire door<br />
fitted with Perko door closer<br />
HD<br />
2no. 305 x 165 x 40 UKB<br />
DIAPHRAGMED<br />
DB<br />
253<br />
2170<br />
2460<br />
290<br />
2953 CHECK DIM<br />
TV<br />
BT<br />
R<br />
2no. 100 x 100 x 4.0 SHS<br />
15.02 15.03<br />
W5<br />
store<br />
100<br />
2170<br />
100<br />
371<br />
DG.03<br />
262<br />
90.00°<br />
W3<br />
1455<br />
845<br />
741<br />
W2<br />
5550 CHECK DIM<br />
24.07<br />
24.08<br />
24.09<br />
3300<br />
300L x 215dp C20 concrete padstone<br />
18.01<br />
300L x 215dp C20 concrete padstone<br />
ELECTRICAL + HEATING KEY<br />
E<br />
CTV<br />
iPod<br />
HP<br />
RT<br />
SD<br />
HD<br />
23.09 FLOOR TYPE F1<br />
GF living accomodation<br />
R1<br />
Slate roof finish<br />
25x38mm tanalised sw battens at<br />
centres to suit slate roofing<br />
Breather membrane, all laps and<br />
penetrations to be sealed<br />
150x50mm C24 rafters @ 600mm c/c<br />
in accordance with structural<br />
engineer's specification<br />
100mm Celotex FR5000 insulation<br />
fitted tightly between rafters<br />
Expert Multi Foil stapled to underside<br />
of rafters to be taped at joints to act as<br />
vapour barrier<br />
25x38mm sw battens to underside of<br />
insulation<br />
12.5mm Gyproc Wallboard taped and<br />
skimmed<br />
120 18 150<br />
23.10 FLOOR TYPE F2<br />
GF garage<br />
R2<br />
Dryseal GRP roofing<br />
120mm Kingspan Thermaroof TR26<br />
insulation mechanically fixed back to<br />
roof deck<br />
VCL<br />
18mm OSB decking<br />
50 x 150mm tanalised sw joists<br />
@400mm c/c<br />
12.5mm plasterboard with skim finish<br />
OR<br />
12mm plywood to garage<br />
23<br />
19.01 19.01<br />
W1<br />
2no. 100 x 100 x 4.0 SHS<br />
24.04<br />
587CHECK DIM<br />
raise wall in medium density<br />
blockwork<br />
23.12 ROOF TYPE R1<br />
1F living accomodation<br />
23.13 ROOF TYPE R2<br />
GF living accomodation<br />
GENERAL NOTES<br />
All dimensions are to be checked on site prior to commencement of<br />
works and/or preparation of any shop drawings.<br />
Sizes of and dimensions to any structural elements are indicative only.<br />
See structural engineers drawings for actual sizes/dimensions.<br />
Sizes of and dimensions to any service elements are indicative only.<br />
See service engineer’s drawings for actual sizes/dimensions.<br />
This drawing is to be read in conjunction with all other drawings,<br />
specifications and other Consultants' information.<br />
This is not an `As built drawing’. Moon takes no responsibility for<br />
other parties relying on this information.<br />
Please note that drawing details are subject to change as a result of<br />
site-specific issues.<br />
Information contained on this drawing is the sole copyright of Moon<br />
Design & Build and is not to be reproduced without their permission.<br />
scale<br />
DO NOT SCALE FROM THIS DRAWING.<br />
0m 1 2 3 @ 1:25<br />
15.01<br />
CONISTON COTTAGE<br />
21.03 21.03<br />
21.01<br />
15.02 15.03<br />
24.10<br />
21.02<br />
The Coach House<br />
project<br />
18 Sutherland Place New Garage/Ancillary Building,<br />
Clifton<br />
Land to rear of 51 Canynge Rd,<br />
Bristol BS8 2TZ<br />
Litfield Road, Clifton BS8 3LH<br />
client<br />
Emma Webster & Jonathan<br />
Laredo<br />
drawn JS checked PH AB TN<br />
pricing<br />
comment<br />
planning b regulations construction<br />
rev<br />
- 14.08.15 ISSUED FOR CONSTRUCTION<br />
P7 30.07.15 Issued to building control<br />
P6 29.07.15 Issued to SE<br />
P5 08.07.15 Issued to SDS<br />
P4 01.07.15 Issued to Western Power Distribution<br />
P3 10.06.15 Issued for pricing<br />
P2 29.04.15 Issued for pricing<br />
P1 15.04.15 Issued to Party Wall Surveyor<br />
GENERAL NOTES<br />
date<br />
drawing<br />
All dimensions are to be checked on site prior to commencement of<br />
June 2015 GA GF PLAN<br />
works and/or preparation of any shop drawings.<br />
Sizes of and dimensions to any structural elements are indicative only.<br />
scales<br />
job / drawing no.<br />
1:25 @ A1 See structural engineers drawings for actual sizes/dimensions.<br />
LRG.10/-<br />
Sizes of and dimensions to any service elements are indicative only.<br />
See service engineer’s drawings for actual sizes/dimensions.<br />
This drawing is to be read in conjunction with all other drawings,<br />
specifications and other Consultants' information.<br />
This is not an `As built drawing’. Moon takes no responsibility for<br />
other parties relying on this information.<br />
Please note that drawing details are subject to change as a result of<br />
site-specific issues.<br />
Information contained on this drawing is the sole copyright of Moon<br />
Design & Build and is not to be reproduced without their permission.<br />
DO NOT SCALE FROM THIS DRAWING.<br />
scale<br />
100 200 300 400<br />
0mm 500mm @ 1:5
White Design<br />
LILAC, Leeds<br />
Community
Rene Van Zuuk<br />
Canal view<br />
Viewpoint<br />
Rene Van Zuuk Visitors centre<br />
Model
Studies<br />
Concept sketch<br />
Aerial<br />
Collective Works Installation<br />
Soft play
Collective Works Reading time<br />
Multi-use<br />
Studies Physical model<br />
Domestic scale
Collective Works Approach<br />
Lake side
9 Cherry Laurel Walk, London, SW2 2DA<br />
t: 07718 241 154 e: jo.scragg@gmail.com