Railway_Digest__February_2018
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
from 8km/h to 15km/h. Crossover points 521<br />
were brought into use. Crossover points 523,<br />
which had been between the Up Main and<br />
Down Shore lines, were altered to form a facing<br />
crossover between the Down Shore and Up<br />
Main lines. 526 facing crossover (Down and<br />
Up Shore lines) was altered to align with other<br />
trackwork alterations. New crossover 528 allows<br />
trains in the No. 1 Up Siding to access the Up<br />
Shore line. New facing crossover points 529<br />
between the Down and Up Main lines, which<br />
had been previously installed from 28/10/2017,<br />
were brought into use. New crossover 530<br />
(trailing, Up Main, facing, Up Shore line) was<br />
provided, allowing access between the Car<br />
Shed roads and the Main and Shore lines; this<br />
incorporates a diamond crossing on the lead<br />
to No. 1 Up Siding. Existing catchpoints 531<br />
(Up Loop) were removed, with new points<br />
531A (trailing, Up Shore) and catchpoints 531B<br />
(Outwards Car Shed road) provided. Existing<br />
533 and 534 crossovers were removed, with<br />
533 points (Up Shore) operating in conjunction<br />
with facing crossover 534 (between the Inwards<br />
and the Outwards Car Shed roads) installed.<br />
Containment catchpoints 544 are provided in<br />
the No. 1 Up Siding.<br />
On the Down Main line, signals HY24, HY53<br />
and HY72 received additional/altered aspects.<br />
On the Up Main line, signal HY55 was relocated<br />
onto a signal gantry (also supporting HY57 and<br />
HY59) with altered aspects. Shunt signal HY58<br />
was replaced with running signal HY58. Signals<br />
HY74, HY106, HY132 and HY134 received new/<br />
altered aspects.<br />
On the Down Shore line, HY35 signal received<br />
altered aspects. HY57 was relocated onto a<br />
gantry (with HY55 and HY59), with altered<br />
aspects. HY46 Indicator was re-named as HY46<br />
Co-Acting. New signals HY43 and HY63 were<br />
provided at 25.004km and 34.214km respectively<br />
(the shorter distance being via the Shore line).<br />
On the Up Shore line, HY48 Indicator was<br />
re-named as HY48 Co-Acting. HY59 was<br />
relocated onto the gantry with HY55 and HY57,<br />
with new aspects. HY62 was re-named as HY68,<br />
with altered aspects. HY105 signal also received<br />
new aspects. New signals SH15.46, HY62, HY77,<br />
HY78 and HY82 were provided.<br />
Down Relief line signal HY60 received new<br />
aspects.<br />
Turnback 1 line signal HY70 also received new<br />
aspects.<br />
New signals HY80 and HY86 were provided on<br />
the Outwards Car Shed road. New signal HY84<br />
was provided on the Inwards Car Shed road.<br />
Signals HY86 and HY84 were installed on the<br />
same gantry with HY82 (Up Shore line).<br />
Marrar (Junee – Griffith line). In conjunction<br />
with level crossing improvement works, three<br />
new Main Line Indicators were provided from<br />
30/01/<strong>2018</strong>. MLI “B” faces Down trains at<br />
508.500km; MLI “X” and “D” face Up trains<br />
at 508.532km and 509.487km respectively.<br />
The operation of these Main Line Indicators<br />
is interlocked with Frames B and D to prevent<br />
unnecessary operation of the level crossing<br />
warning devices.<br />
Moolarben Coal Loop The Fixed Red signal<br />
located on the Arrival Road at 434.125km was<br />
relocated to 434.249km on 16/11/2017.<br />
Parkes (Orange line). The Down Landmark<br />
was relocated from 442.165km to 441.000km<br />
on 19/12/2017.<br />
Redfern (Illawarra). Crossover points 653<br />
(trailing crossover between Up Illawarra and<br />
Down Illawarra lines, Down side of Redfern<br />
station) were renewed and upgraded from<br />
09/12/2017. Both turnouts were relocated 2m<br />
in a Down direction. During this work, signal<br />
SY456I was relocated 22m in a Down direction.<br />
Stanwell Park (Illawarra). Down signals<br />
WG673, WG681 (Down Main) and WG675<br />
(Up Main), and Up signals WG680, WG682<br />
(Up Main) and WG678 (Down Main) were<br />
upgraded to LED type from 11/11/2017.<br />
Wahroonga (North Shore line). Up Automatic<br />
signal SH14.10 (Up Main) was upgraded to LED<br />
type from 28/10/2017. The medium aspect was<br />
removed, and the lower yellow aspect was<br />
“blanked out”.<br />
Warrell Creek (North Coast line). The Main<br />
Line, which was relocated between 542.769km<br />
and 543.262km from 06/08/2016 (see RD,<br />
August 2016, page 49) was reinstated at the<br />
original location, incorporating a new section<br />
of track and bridge over the upgraded Pacific<br />
Highway on 04/12/2017 (Eungai – Nambucca<br />
Heads section).<br />
Wollongong (Illawarra). Up signals WG428<br />
(Down Main) and WG430 (Up Main) were<br />
upgraded to LED type from 11/11/2017. The<br />
“shunt ahead” aspects on Up signals WG466<br />
(departing platform 2) and WG468 (departing<br />
platform 1) were replaced by “shunt” aspects.<br />
Two new Guards Indicators were provided<br />
operating in conjunction with Down signal<br />
WG461 (platform 2).<br />
Yagoona (Bankstown line). The Guards<br />
Indicator on platform 1 facing Up trains was<br />
upgraded to LED type from 04/11/2017. The<br />
other Guards Indicator on platform 1, and both<br />
Guards Indicators on platform 2 were removed.<br />
A new LED type Guards Indicator was provided<br />
on platform 2, facing Down trains.<br />
Victoria<br />
Richmond – East Richmond – Burnley –<br />
Burnley Sidings (Burnley being the junction<br />
between the Ringwood and Glen Waverley<br />
lines). Commencing 30/11/2017, the Burnley<br />
Signal Box was de-commissioned. Control of<br />
all signalling functions for the Burnley and<br />
Burnley Sidings areas was transferred to a new<br />
signal control panel at Metrol, using a Westlock<br />
computer-based interlocking. The 25Hz high<br />
voltage signal power supply was upgraded<br />
to a 50Hz system. The illuminated letter “A”<br />
indications provided at various Home signals in<br />
this area were removed.<br />
Down Home signals ERM306 and ERM328 and<br />
Down Automatic signal L89 were abolished.<br />
All remaining signals between the Up end of<br />
Richmond platforms, commencing with Down<br />
Automatic signals 298 (Down Burnley Local)<br />
and 278 (Down Burnley Through), and Up<br />
Automatic signals L72 (Up Burnley Local) and<br />
H72 (Up Burnley Through line), to the Down<br />
side of the Yarra River on the Ringwood line<br />
(L163 and H163, the Down and Centre lines<br />
respectively), and Up signals L156 (Automatic,<br />
Up line, now converted to a Home signal and<br />
re-numbered as BLY369) and BLY345 (Home,<br />
Centre line, re-numbered to BLY339), and<br />
on the Glen Waverley line to Down Home<br />
signal BLY380, and from the Glen Waverley<br />
line commencing at Up Home signal BLY383<br />
(including the Burnley Stabling Sidings area)<br />
were converted to LED type. Many signals<br />
in this area were re-numbered, with other<br />
alterations including aspect changes and<br />
relocation onto tilt masts in situ being made.<br />
Down Automatic signals L71 (now RMD322),<br />
H71 (now RMD342), H83 (now ERM342),<br />
BLY312 (now BLY324), BLY334 (now BLY344),<br />
Down Dwarf signal BLY340 (now BLY366), and<br />
Up Automatic signals BLY281 (now BLY379),<br />
L156 (now BLY369), and Up Dwarf signal<br />
BLY321 (now BLY315) were converted to Home<br />
signals. All points were retained, although<br />
several of these were re-numbered as well.<br />
Carnegie (Caulfield – Dandenong line). In<br />
conjunction with level crossing removal works,<br />
this station was temporarily closed between<br />
14/10/2017 and 19/11/2017.<br />
Croydon (Ringwood – Lilydale line). Up<br />
Automatic signal H942 was upgraded to LED<br />
type from 18/10/2017.<br />
Dunolly (junction between Yelta and Korong<br />
Vale lines). Commencing 14/10/2017, No. 2<br />
Road was abolished. Dunolly is no longer<br />
available as a Train Order Crossing Station,<br />
its status being changed to an Intermediate<br />
Train order Station. No. 1 Road (the passenger<br />
platform road) is now the only track available<br />
for use. No. 7 points (Up end of crossing loop)<br />
were abolished, with the track now laying for<br />
No. 1 Road; the trailable point machine and<br />
Banner were also abolished. No. 27 points<br />
(Down end of Loop) were locked and secured<br />
in the Reverse position (laying for No. 1 Road);<br />
the Banner was abolished. The crossovers<br />
between No. 2 Road and yard sidings 3/4/5<br />
operated by points E, (trailing Up moves,<br />
middle of yard), F (facing Up moves, middle<br />
of yard) and G (facing Up moves, Down end<br />
of yard) were abolished. Points A (Main line,<br />
facing Down moves into 3 & 4 roads) remain<br />
in situ, locked and secured at this stage. The<br />
three dual-gauge fixed turnouts provided to<br />
allow standard-gauge trains to terminate clear<br />
of the broad-gauge tracks were removed (these<br />
led to points D, J and H). At this stage, the only<br />
points from the original yard layout remaining<br />
were points “A” (Up end, main line to yard), 27<br />
points (Down end, 1 – 2 roads), and 29 points<br />
(main line to Korong Vale line). All points are<br />
locked and secured directing trains to run via<br />
the platform track to/from the Korong Vale line.<br />
Further stage works were introduced from<br />
04/12/2017. A Fixed-Gauge Splitter (numbered<br />
DLY 7) was installed facing Down trains on the<br />
Up end of the yard, on the Down side of the<br />
FEBRUARY <strong>2018</strong> 41