Athletic Hall of Fame Inductees - 2007 - Huron City Schools
Athletic Hall of Fame Inductees - 2007 - Huron City Schools
Athletic Hall of Fame Inductees - 2007 - Huron City Schools
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Huron</strong> Set to Realign<br />
and Refurbish <strong>Schools</strong><br />
What is the wisest and best use <strong>of</strong> <strong>Huron</strong><br />
<strong>City</strong> School District’s present<br />
school buildings? A perennial question<br />
on the minds <strong>of</strong> conscientious board<br />
members anywhere, but especially poignant<br />
in <strong>Huron</strong> these days. Our buildings<br />
are ageing, and as the Medicare<br />
administrators are learning, advanced<br />
age brings problems, costly ones. Perhaps<br />
the chief problem is growing energy<br />
costs, that is, buildings designed<br />
decades ago when gasoline was .23 per<br />
gallon, electricity pennies per kilowatt<br />
hour, and gas lights were being sold as<br />
an esthetic enhancement to the white<br />
picket fence out front. So as the man in<br />
the ad said some years back, “You can<br />
pay me now, or you can pay me later.”<br />
The <strong>Huron</strong> district is acting to take advantage<br />
<strong>of</strong> state programs available now.<br />
The oldest building, McCormick Middle<br />
School on Ohio Street opened back in<br />
the middle <strong>of</strong> WWII and is showing the<br />
most wear and need for costly repairs,<br />
maintenance, and upgrading. Shawnee<br />
School on Cleveland Road originally<br />
served as an East Side elementary starting<br />
in 1953 until enrollment dropped.<br />
Now it houses the Montessori School<br />
and many Erie County service providers<br />
under rental agreements with the<br />
board which houses its own <strong>of</strong>fices in<br />
“the basement” <strong>of</strong> the building. Again<br />
it is beginning to show its age and is<br />
highly energy inefficient. Finally, the<br />
youngest elementary, Woodlands on the<br />
West Side, opened in the early 70’s after<br />
sitting empty until the community<br />
finally passed an operating levy. It has<br />
had a classroom addition and gymnasium<br />
added since 2000. The high<br />
school is in the midst <strong>of</strong> a phased improvement,<br />
the latest occurring this<br />
past summer with the entire first floor<br />
academic and shop wing refurbished.<br />
A while back, the Board <strong>of</strong> Education<br />
began discussions with Bowling Green<br />
State University about possibly expanding<br />
their summer playhouse usage at<br />
McCormick Middle School to year<br />
around for their productions and even<br />
classes. Those discussions are now<br />
near the point where the University is<br />
willing to invest in the building dollars<br />
that the school district does not have in<br />
exchange for an increased presence<br />
there. This obviously would necessitate<br />
reshuffling some <strong>of</strong> the students<br />
presently there into other buildings.<br />
A plan will now go forward that would<br />
put all pre-school through second grade<br />
students in the Shawnee School building,<br />
grades 3 through 6 into Woodlands<br />
Elementary, and leave grades 7 and 8 in<br />
the McCormick Building. Such a<br />
change would save the expense <strong>of</strong> moving<br />
most <strong>of</strong> the junior high students to<br />
Shawnee and having to construct a gymnasium<br />
for them there and then stuffing<br />
the remainder into Woodlands. No<br />
more students in all kinds <strong>of</strong> inclement<br />
weather racing between buildings<br />
for lunch, gym and other classes, or<br />
assemblies. (How ever shall they stay<br />
in shape! More carrots on the menu!)<br />
The rental “tenants” in Shawnee would<br />
take over the McCormick Annex building<br />
on Ohio Street and the board would<br />
remain in their basement digs. Bottom<br />
line - room would be freed up for Bowling<br />
Green in the McCormick building.<br />
Of course, every taxpayer is clamoring,<br />
“Where will the money come<br />
from?” The renovations at Shawnee<br />
and McCormick will be paid for as a<br />
H.B. 264 project. This was a program<br />
instituted some years back at the state<br />
level to assist districts in saving energy,<br />
making their buildings greener<br />
– before that term was ever used. So<br />
anything that ultimately saves energy<br />
can be part <strong>of</strong> the project – more efficient<br />
boilers and hot water heaters,<br />
thermal windows and doors, lighting<br />
upgrades that practically run on hamster<br />
generators yet don’t leave the students<br />
squinting. All these and more<br />
are part <strong>of</strong> the plan to give the district a<br />
new, leaner look. The dollars saved from<br />
increasing energy costs are then used<br />
to pay <strong>of</strong>f the low interest loan from the<br />
state over a number <strong>of</strong> years. The<br />
higher the energy costs, the sooner the<br />
payback. Kind <strong>of</strong> ironic, not? The projected<br />
savings will be great because<br />
both Shawnee and McCormick have<br />
been banging around somewhere in<br />
limbo for years as various administrations<br />
debated what to do with the buildings.<br />
Now we know<br />
Sound terribly complicated? Maybe,<br />
and perhaps to the teachers and students<br />
who will be juggled around to<br />
make the plan work it will seem that<br />
way for a while. But stranger moves<br />
have been made in the past and actually<br />
worked, to the benefit <strong>of</strong> the entire student<br />
body – and the taxpayers – once<br />
everyone settled in. Will there be problems<br />
to overcome in such a realignment?<br />
Of course, but with everyone<br />
pulling together, immense benefits to<br />
the community will accrue as a stronger<br />
arts facility begins to take shape in<br />
that old Ohio Street Art Deco white elephant<br />
and Shawnee is revitalized.<br />
Additional projects will be worked on<br />
at the high school also. Any grad who<br />
wants to put his name on a room or facility<br />
is encouraged to contact the superintendent<br />
who would be happy to explain<br />
how many zeros are needed and<br />
why.<br />
Wisdom dictates this action now to save<br />
the district dollars in the future without<br />
compromising quality education.<br />
The timeline to accomplish all this is<br />
to have it fully implemented by the fall<br />
<strong>of</strong> 2008. That seems to be cutting it<br />
close, but after all, the high school’s<br />
first floor was gutted, rebuilt, and had<br />
students back in place all within 90<br />
days over this past summer. Someone<br />
ought to be getting good at this by now!<br />
We’ll keep you posted.<br />
A Newsletter <strong>of</strong> the <strong>Huron</strong> High<br />
School Alumni Association published<br />
quarterly in <strong>Huron</strong>, Ohio.<br />
Mailing Address:<br />
710 Cleveland Road West<br />
<strong>Huron</strong> OH 44839<br />
Telephone: 419-433-3171<br />
<strong>Huron</strong>_Alumni@<strong>Huron</strong>-<strong>City</strong>. K12.OH.US